Laserfiche WebLink
r r r r r r r r r r r r r r r r f r r <br /> 4.4 Transportation and Circulation <br /> TABLE 4.4-3 <br /> AM PEAK HOUR ROAD SEGMENT LEVEL OF SERVICE SUMMARY <br /> Level of Service <br /> Cumulative Cumulative Future(2025) Future(2025) <br /> Existing with Cumulative with Project with Project Future(2025) with Project with Project <br /> Seasonal Without Haul Route Haul Route Without Haul Route Haul Route <br /> Road Segment Existing Adjustments Project Option 1 Option 2 Project Option 1 Option 2 <br /> Bird Road <br /> Blewett to SR 132 A A 6 C C B C C <br /> SR 132 <br /> Chrisman to Bird' D D D E E F F F <br /> Bird to 1-5 A A A A A B C B <br /> 1-5 to Koster' D D D D E F F F <br /> Koster to McCracken D D D D D F F F <br /> Blewett Road <br /> Bird to 1-5 A A A B A A B B <br /> 1-5 to Koster <br /> `The reported level of service is based on a two-lane highway.Where the highway consists of four lanes,the levels Of service are LOS C or better. <br /> SOURCE: Peters Engineering,2004 <br /> RMC Pacific Vernalis Quarry Mining and Reclamation Project - ESA/203015 <br /> Draft Environmental Impact Report <br /> May 2006 <br />