Laserfiche WebLink
4.Environmental Analysis <br /> TABLE 4.4.2 <br /> AM PEAK HOUR INTERSECTION LEVEL OF SERVICE SUMMARY <br /> Level of Service <br /> Cumulative Cumulative Future(2025) <br /> Existing with Cumulative with Project with Project with Project Future(2025) <br /> Intersection Seasonal Without Haul Route Haul Route Future(2025) Haul Route with Project Haul <br /> Approach Existing Adjustments Project Option 1 Option 2 Without Project Option 1 Route Option 2 <br /> SR 132/Bird <br /> Eastbound L B B B B B C C C <br /> Westbound L A A A A A A B A <br /> Northbound LTR C C F F F F F F <br /> Southbound LTR C D E F E F F F <br /> SR 132/1(oster <br /> Eastbound L A A A A A C C C <br /> Westbound L A A A A A A A A <br /> Southbound LTR C C C C C F F F <br /> Northbound LTR C D D D C F F F <br /> SR 132Melty <br /> Westbound L A A A A A A A A <br /> Northbound LR C C C C C F F F <br /> Blewett/Bird <br /> Westbound LR A A A B A A B A <br /> Southbound LT A A A A A A A A <br /> Blewett/Koster <br /> Eastbound LTR A A A A A A A A <br /> Westbound L A A A A A A A A <br /> Northbound LTR A A A B A A B B <br /> Southbound LTR A A A A A A A A <br /> SR 132/McCracken <br /> Eastbound L A A A A A B B B <br /> Westbound L A A A A A A A A <br /> Northbound LTR C C C C C F F F <br /> Southbound LTR C C C C C F F F <br /> Note: LTR = One-lane approach with Left Turm Through/Right Turn movements <br /> L = Left Turn <br /> LR = One-lane approach with Left Turn/Right Turn movements <br /> LT = One-lane approach with Left Tum/Through movements <br /> RMC Pacific Vernalis Quarry Mining and Reclamation Project 4.4-8 ESA/203015 <br /> Draft Environmental Impact Report May 2006 <br />