My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0004094
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
K
>
KOSTER
>
36736
>
2600 - Land Use Program
>
QX-01-0002
>
SU0004094
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/27/2020 1:02:10 PM
Creation date
9/6/2019 10:43:21 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0004094
FACILITY_NAME
QX-01-0002
STREET_NUMBER
36736
Direction
S
STREET_NAME
KOSTER
STREET_TYPE
RD
City
TRACY
ENTERED_DATE
5/12/2004 12:00:00 AM
SITE_LOCATION
36736 S KOSTER RD
RECEIVED_DATE
1/8/2002 12:00:00 AM
QC Status
Approved
Scanner
SJGOV\wng
Supplemental fields
FilePath
\MIGRATIONS\K\KOSTER\36736\QX-01-02_PA-0200065\SU0004094\EIR 2004.PDF
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2073
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
4.Environmental Analysis _ <br /> regarding their production peaks. This adjustment is applied to convert the average annual daily — <br /> and peak-hour project traffic volumes to the corresponding volumes that would be expected <br /> during summer months, when production reaches seasonal peaks. Table 4.4-4 presents daily and <br /> peak-hour project traffic volumes expected during peak summer months. Employee trips to and <br /> from the site, as well as delivery trucks (cement, recycled materials, and other minor deliveries), <br /> were not included in the peak-hour analysis because these trips will not occur during the peak <br /> hour. The term trip refers to a one-way trip; thus a truck's roundtrip constitutes two trips. J <br /> TABLE 4.4-4 <br /> PROJECT TRIP GENERATION <br /> Annual Average Peak Seasonal Average <br /> Annual Loads <br /> Production(tons) 4,000,000 4,000,000 <br /> Aggregate Truck Loads(25 tons/truck) 160,000 160,000 <br /> Recycling Truck Loads 780 780 <br /> Cement Truck Loads 780 780 <br /> Annual Trips <br /> Aggregate Truck Trips(Inbound+Outbound) 320,000 320,000 <br /> Recycled Material Truck Trips 1,560 1,560 <br /> Cement Truck Trips(Inbound+Outbound) 1,560 1,560 <br /> Total Truck Trips 323,120 323,120 <br /> Daily Loads(266 days/year) <br /> Aggregate Truck Loads 613 981 <br /> Recycling Truck Loads 3 5 <br /> Cement Truck Loads 3 5 <br /> Daily Trips <br /> Employee Trips(Non-Truck) 80 80 <br /> Aggregate Truck Trips(Inbound+Outbound) 1,226 1,962 <br /> Recycled Material Truck Trips 6 10 <br /> Cement Truck Trips(Inbound+Outbound) 6 10 <br /> Total Truck Trips 1,238 1,982 <br /> Hourly Trips <br /> Average Aggregate Truck Loads(8 hours/day) 77 123 <br /> Peak-Hour Truck Loads(1.25 x average) 96 153 <br /> Total Peak-Hour Trips(UB+O/B) 192 306 <br /> The traffic volumes expected to be generated by the approved mining site not yet in operation on <br /> Bird Road south of Blewett Road are shown in Figures I 1 and 12 contained in Appendix C. <br /> These approved-project traffic volumes were estimated based on a review of the Environmental <br /> Impact Reports for Brown Sand and Gravel(final report dated July 1997, State Clearinghouse <br /> Number 960-42075). <br /> RMC Pacific Vemalis Quarry Mining and Reclamation Project 4.4-12 ESA 1203015 <br /> Draft Environmental Impact Report May 2006 <br />
The URL can be used to link to this page
Your browser does not support the video tag.