My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0004094
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
K
>
KOSTER
>
36736
>
2600 - Land Use Program
>
QX-01-0002
>
SU0004094
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/27/2020 1:02:10 PM
Creation date
9/6/2019 10:43:21 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0004094
FACILITY_NAME
QX-01-0002
STREET_NUMBER
36736
Direction
S
STREET_NAME
KOSTER
STREET_TYPE
RD
City
TRACY
ENTERED_DATE
5/12/2004 12:00:00 AM
SITE_LOCATION
36736 S KOSTER RD
RECEIVED_DATE
1/8/2002 12:00:00 AM
QC Status
Approved
Scanner
SJGOV\wng
Supplemental fields
FilePath
\MIGRATIONS\K\KOSTER\36736\QX-01-02_PA-0200065\SU0004094\EIR 2004.PDF
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2073
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
4.Environmental Analysis <br /> Haul Route 3 — <br /> Impact 4.4.5: Implementation of Haul Route 3 could result in level of service impacts at the <br /> intersection of SR 33 and Welty Road.This impact is less than significant. _ <br /> After completion of the draft traffic impact study for the project,a third potential haul route was <br /> identified. A technical memorandum addressing the implementation of the third haul route is <br /> included in its entirety in Appendix C,Part iii, of this EIR. The third haul route consists of: <br /> Haul Route 3: This alternative involves trucks leaving the site and traveling north on Koster — <br /> Road to Blewett Road,east on Blewett Road to Welty Road, north on Welty Road to <br /> SR 33,northwesterly on SR 33 to Interstate 5 and further destinations (see Appendix C, <br /> Part iii,Figure 1). — <br /> The supplemental traffic analysis specifically evaluated the potential effects of implementation of <br /> Haul Route 3 on the intersection of SR 33 and Welty Road. Existing conditions for all approaches <br /> to the SR 33 and Welty Road intersection are currently operating at LOS A. Under the cumulative <br /> with Haul Route 3 conditions,the LOS for the northbound and southbound approaches would <br /> reduce to LOS B,while the other approaches remain at LOS A. Likewise, under the future(2025) <br /> with Haul Route 3 conditions,the northbound approach would be at LOS C,the southbound <br /> approach would be at LOS B and the other approaches would remain at LOS A. All are <br /> considered acceptable levels of service. Thus, implementation of Haul Route 3 would result in — <br /> less-than-significant impacts to the intersection of SR 33 and Welty Road. However, it should be <br /> noted that San Joaquin County Public Works staff have indicated that they will not support the <br /> use of Haul Route 3 as an alternative access to the site. — <br /> Mitigation: No mitigation is required. — <br /> RMC Pacific Vernalis Quarry Mining and Reclamation Project 4.4-20 ESA 1203015 <br /> Draft Environmental Impact Report May 2006 <br />
The URL can be used to link to this page
Your browser does not support the video tag.