4.4 Transportation and Circulation <br /> TABLE 4.4.5 <br /> TRAFFIC INDEX(20-YEAR)SUMMARY <br /> Traffic Index With Project <br /> Lane Shoulder Existing <br /> .� Width Width Traffic Haul Route Haul Route <br /> Road Segment (Feet) (Feet) Index Option 1 Option 2 <br /> Blewett Road East of Bird Road 11 0.5 10.0 11.5 " 10.5(EB) <br /> _ 11.5(WB) <br /> Blewett Road East of I-5 10.5 0 9.0 11,5 9.5(EB) <br /> 11.5(WB) <br /> Bird Road Blewett Road to SR 132 12 3 12.0' 12.5 12.5(NB) <br /> Koster Road Blewett Road to SR 132 11 0.5 Minimal NA 19.0(SB) <br /> SR 132 East of Bird Road 12 10 13.0" 13.5 13.5(EB) <br /> 13.0(WB) <br /> r SR 132 East of 1-5 12 10 13.0"' 13.0 13.0 <br /> SR 132 West of Bird Road 12 10 13.0" 13.0 13.0 <br /> SOURCE: Brown Sand and Gravel Environmental Impact Report,State Clearing House Number 960-42075,Table 9-11,pg. <br /> 9-36. <br /> Based on traffic volume data available from Caltrans websites <br /> NA=Not applicable;EB=eastbound;WB=westbound;NS=northbound;SB=southbound <br /> SR 132 Between Interstate 580 and McCracken Road <br /> �- The project applicant or successor-in-interest shall he required to contribute to the cost of <br /> pavement structural section upgrades between Bird Road and Interstate 5. The contribution <br /> to upgrades would be required for both directions of travel based on Haul Route Option I, <br /> ` and only the eastbound direction of travel for Haul Route Option 2. <br /> Blewett Road Between Bird Road and Interstate 5 <br /> The project applicant or successor-in-interest shall contribute its fair share to future <br /> pavement upgrades on this road segment. <br /> Blewett Road Between Interstate 5 and Koster Road <br /> The project applicant or successor-in-interest shall contribute its fair share to future <br /> pavement upgrades on this road segment. <br /> Koster Road Between Blewett Road and SR 132 <br /> The project applicant would be solely responsible for funding the required upgrades on this <br /> road segment if Haul Route Option 2 were selected. The project will not utilize this portion <br /> of Koster Road with Haul Route Option 1. <br /> Impact Significance After Mitigation: Less than significant. <br /> RMC Pacific Vernalis Quarry Mining and Reclamation Project 4.4-19 ESA/203015 <br /> Draft Environmental Impact Report May 2006 <br />