Laserfiche WebLink
4.Environmental Analysis - <br /> TABLE 4.5-5 - <br /> EXISTING AND PROJECTED MORNING PEAK-HOUR <br /> TRAFFIC NOISE LEVELS ALONG LOCAL ROADWAYS <br /> (dBA, Leq'-"-c) <br /> Cumulative <br /> Existing Plus Haul Route Plus Haul Route <br /> Segment Roadway Cumulative <br /> No. Segment Existing Opt.1 Opt.2 Opt.3 No Project Opt.1 Opt 2 Opt.3 - <br /> Koster Road south <br /> 1 63.9 76.4 76.4 76.4 70.0 <br /> of Blewett Road <br /> Blewett Road east - <br /> 2 58.8 58.8 58.8 77.1 65.4 65.4 65.4 77.3 <br /> of Koster Road <br /> 3 Welty Road north 64.6 64.6 64.6 76.4 66.8 66.8 66.8 76.6 <br /> of Blewett Road <br /> 4 Welty Road south 65.4 65.4 65.4 65.4 66.8 66.8 66.8 66.8 <br /> of Blewett Road <br /> Koster Road south <br /> 5 65.8 65.8 74.5 65.8 71.6 71.6 75.9 71.6 <br /> of State Route 132 <br /> State Route 132 <br /> 6 east of Koster 75.6 76.4 76.4 76.4 83.2 83.3 83.3 83.3 <br /> Road <br /> State Route 132 <br /> 7 west of Koster 75.4 76.1 77.1 76.1 83.2 83.3 83.5 83.3 <br /> Road <br /> Blewett Road east <br /> 8 68.9 77.7 75.0 66.9 73.7 78.7 76.8 73.7 <br /> of Bird Road <br /> Slate Route 33 <br /> 9 west of Welty 66.9 NA NA 77.0 74.9 NA NA 78.8 <br /> Road <br /> ' Noise levels were calculated using the FHWA Traffic Noise Prediction Model for weekday morning peak-hour conditions during <br /> periods of maximum production.Noise levels were calculated at roughly 50 feet from the centerline of the roadway. <br /> ° The proportion of trucks and automobiles and their respective speeds differ for each of the modeled road segments based on the <br /> professional assumptions of Peters Engineenng Group and ESA. <br /> ` The Cumulative No Project scenario is based on Future No Project plus Granite Operation and the Cumulative Plus Haul Route - <br /> scenarios are based on Future No Project plus Granite Operation plus respective Haul Route traffic. <br /> Bold and underlined values show potentially significant noise increases prior to any mitigation.NA= Not Available. <br /> SOURCE: Environmental Science Associates,2006 <br /> To assess potential noise impacts,the project and cumulative scenarios are compared to existing _ <br /> conditions using Significance Criteria 1 and 2 (discussed above): <br /> 1. A 3 dBA DNL increase in noise as a result of project operations if the resulting level - <br /> exceeds the "normally acceptable range"for the land use(65 dBA DNL or less for <br /> residential development). <br /> 2. A 5 dBA DNL increase in noise as a result of project operations if the resulting level <br /> is within the"normally acceptable range"for the land use. <br /> In analyzing noise effects from the haul routes,the general rule is applied that in areas where - <br /> traffic dominates the noise environment, the L,during the peak-hour is roughly,equivalent <br /> (within about 2 dBA)to the DNL at that location. <br /> RMC Pacific Vernalis Quarry Mining and Reclamation Project 4.5-20 ESA/203015 <br /> Draft Environmental Impact Report May 2006 <br />