Laserfiche WebLink
4.9 Biological Resources <br /> V <br /> protection to explain endangered species concerns to contractors, their <br /> �. employees, and agency personnel involved in the project. The program shall <br /> include the following: a description of the San Joaquin kit fox and its habitat <br /> needs;a report of the occurrence of kit fox in the project area; an explanation <br /> of the status of the species and its protection under the Endangered Species <br /> Act; and a list of measures being taken to reduce impacts to the species during <br /> project construction and implementation. A fact sheet conveying this <br /> information shall be prepared for distribution to the above-mentioned people <br /> and anyone else who may enter the project site. <br /> 10. In the case of trapped animals, escape ramps or structures shall be installed <br /> " immediately to allow the animal(s)to escape, or the Service shall be contacted <br /> for advice. <br /> .. Measure 4.9.2b: The project shall avoid causing the failure of nesting tricolored colonies. <br /> The following mitigation measures shall be implemented prior to implementation of any <br /> Phase of mining. <br /> r <br /> (1) Comply with the SJMSCP. For Phases complying with the SJMSCP,no further <br /> mitigation is required, or <br /> INN (II) Phases not complying with the SJMSCP, silt ponds, detention basins, or other bodies <br /> of water created by the project within 250 feet of the Phase shall be surveyed for <br /> breeding tricolored blackbirds; this survey shall occur between March 15 and <br /> June 15. Any active colonies shall be protected from operations activities by a <br /> 250-foot buffer. <br /> (III) If silage crops are grown on project land prior to being mined or when reclaimed, <br /> these crops shall be surveyed by a biologist prior to harvesting. If tricolored <br /> blackbirds are nesting in the silage,the entire field shall not be harvested until the <br /> colony is no longer active. <br /> Measure 4.9.2c: Conditions in the project area currently provide breeding habitat for <br /> ` Swainson's hawk and white-tailed kite. Site conditions will change over the 26-to 60-year <br /> life of the project; therefore, the following mitigation measures shall be implemented prior <br /> to implementation of any phase of mining. For any phase where ground-disturbing <br /> activities would commence during the raptor breeding season(March 15 through <br /> August 31), the applicant shall: <br /> (I) Comply with the SJMSCP. For Phases complying with the SJMSCP,no further <br /> mitigation is required, or <br /> (II) For Phases not complying with the SJMSCP, the applicant shall conduct pre- <br /> construction surveys for nesting raptors in suitable habitat within one-half mile(for <br /> Swainson's hawk) and 500 feet(for white-tailed kite)of the Phase boundaries. <br /> Surveys shall begin either at the beginning of the breeding season,or four weeks <br /> prior to beginning mining activities in the Phase, whichever is later. If nesting raptors <br /> are recorded within these buffers,the applicant shall not permit construction <br /> activities within these buffers except in consultation with CDFG. <br /> r Measure 4.9.2d: Conditions at the project site currently provide low suitability habitat for <br /> burrowing owls. Site conditions will change over the 26-to 60-year life of the project; <br /> RMC Pacific Vernalis Quarry Mining and Reclamation Project 4.9-17 ESA 1203015 <br /> Draft Environmental Impact Report May 2006 <br />