Laserfiche WebLink
4. Environmental Analysis <br /> The owners and operators of aboveground storage tanks are required to comply with all laws and — <br /> regulations with respect to the design,construction and monitoring requirements for new and <br /> existing aboveground storage tanks. <br /> The project applicant would be required to complete two Solid Waste Diversion Plan forms. <br /> Form A, Construction and Demolition Debris Waste Diversion Plan, requires the applicant to <br /> address details regarding the quantities of both solid and hazardous waste generated during the <br /> construction phase. In addition,Form A requires the applicant to report the amounts and types of <br /> materials that will be recycled, reused, or disposed. <br /> The project applicant would be required to prepare Form C,Solid Waste Operation Plan, which <br /> asks the applicant to determine projected waste generation once the project becomes operational. <br /> Each type of material that is to be recycled must also list the: — <br /> • Waste management method <br /> • Company selected for recycling — <br /> • Amount of waste quantities that will be diverted <br /> Forms A and C would serve as the Solid Waste Management Plan for the project. In addition,the — <br /> Plan should indicate space for recycling bins and show the location of the bins. Verification by <br /> the Solid Waste Division that the Waste Plan is adequate is also required. <br /> Due to the current laws and regulations that the project applicant would be required to comply <br /> with regarding above-ground fuel storage tanks and hazardous materials,the project would be <br /> consistent with all applicable policies of the San Joaquin County General Plan and the Stanislaus — <br /> County General Plan with regards to hazardous materials. <br /> A HMMP would be prepared and submitted to both the San Joaquin County Environmental — <br /> Health Department and the Stanislaus County Environmental Health Department. This plan <br /> would include an inventory of hazardous materials and hazardous wastes, as well as an <br /> emergency response to incidents involving those hazardous materials and wastes. The plan <br /> would be located on the property at all times and employees would be trained on the details of the <br /> plan. <br /> Current federal regulations (40 C.F.R. § 112,et seq.) require operations storing more than <br /> 1,320 gallons of petroleum products to have a Spill Prevention Control and Countermeasure Plan <br /> (SPCC). The Aboveground Petroleum Storage Act Program, administered by the State Water <br /> Resources Control Board,requires owners or operators of aboveground storage tanks to: <br /> • File a storage statement defining the quantity of petroleum stored on-site(applies to a <br /> single petroleum tank that stores greater than 660 gallons of petroleum product,or <br /> facilities with a cumulative petroleum storage capacity of greater than 1,320 gallons). <br /> • Pay a bi-annual facility fee. <br /> • Prepare and implement a Federal SPCC Plan. A registered professional engineer _ <br /> must certify the SPCC plan and a complete copy maintained on the site at all times. <br /> RMC Pacific VernalisQuarry Mining and Reclamation Project ESA 1203015 <br /> Draft Environmental Impact Report May 2006 <br />