Laserfiche WebLink
5.Alternatives — <br /> • The requirement of the CEQA Guidelines to consider a"no project'alternative and — <br /> to identify an"environmentally superior"alternative in addition to the no-project <br /> alternative [CEQA Guidelines, Section 15126.6(e)]. <br /> In view of the factors presented above, the following alternatives were selected for evaluation in <br /> this EIR: <br /> Alternative 1 —No Project Alternative <br /> Alternative 2—Reduced Project Production <br /> Alternative 3—Off-Site Alternative <br /> 5.1 .2 Alternatives Eliminated from Further Consideration <br /> CEQA Guidelines Section 15126.6(f)(2)specifically addresses the requirements for <br /> consideration of alternate locations. A pivotal consideration is whether any of the significant <br /> impacts of the project would be avoided or substantially lessened by placing the project at another _ <br /> location. If another location would not avoid or substantially lessen the environmental impacts <br /> associated with the project location,or if the alternate location would result in one or more <br /> significant adverse environmental effects in addition to those caused at the proposed location, — <br /> then such alternate location may be rejected from further analysis in the EIR. If,during the <br /> scoping process for the EIR,the lead agency concludes that no feasible and environmentally <br /> superior alternate locations exist,the reasons for this conclusion must be briefly explained in the — <br /> EIR. <br /> Alternative Processing Plant Location <br /> This alternative was considered but eliminated from further consideration. Even though some of <br /> the impacts might be reduced over those of the proposed project others would be increased. <br /> Description <br /> Under this alternative, other on-site locations for the processing plant were considered. Two <br /> locations with primary site access from Blewett Road were considered. A location further south <br /> along Koster Road was also considered. — <br /> The two locations considered with access from Blewett Road were: (1)the corner of Blewett <br /> Road and Koster Road(Phase IV)and(2) along the eastern side of the project site(mining — <br /> Phase VII or Phase VIII). The location considered further south on Koster Road is the vicinity of <br /> mining Phase II or Phase III. <br /> Basis for Selection <br /> This alternative is included in the EIR to provide a basis for comparing the impacts of a relocated — <br /> processing plant on-site.Moving the processing plant so that the access to the site would be along <br /> Blewett Road may potentially reduce traffic impacts on Koster Road and those at the intersection <br /> of Koster Road and Blewett Road. Moving the processing plant to a location further south on <br /> Koster Road may potentially reduce visual impacts to residents located along Blewett Road and <br /> RMC Pacific Vernalis Quarry Mining and Reclamation Project 5-2 ESA 1203015 <br /> Draft Environmental Impact Report May 2006 <br />