Laserfiche WebLink
6.5 Effects Not FOUND TO BE SIGNIFICANT <br /> V <br /> • Implementation of the project would contribute to the conversion of prime farmland <br /> ►� and farmland of statewide importance land to non-agricultural uses within the County <br /> over a 26-to 60-year period. When reclaimed to agricultural uses, the types of crops <br /> that could be grown would be limited due to the loss in productivity of the soil and <br /> 6, the loss of direct sunlight during winter and early spring months. <br /> 6.5 Effects Not Found To Be Significant <br /> As required by CEQA, this Draft EIR focuses on expected significant or potentially significant <br /> environmental effects (CEQA Guidelines Section 15143). An Initial Study was prepared for the <br /> project to identify issues to be evaluated in this EIR. Comments received on the Notice of <br /> Preparation that helped to further refine the list of environmental issues to be evaluated in this <br /> 6. EIR are included in Appendix A. <br /> A summary of resource-specific issues that were eliminated from detailed analysis in this EIR is <br /> provided in the Initial Study and in Chapter 2, Section 2.3 of this Draft EIR. Some of the impacts <br /> ` analyzed in this EIR are considered to be less than significant and require no mitigation. Other <br /> impacts(i.e., those considered to be significant)can be reduced to a level that is less than <br /> ` significant with the implementation of the proposed mitigation measures. <br /> All of the impacts analyzed in this EIR, including those considered to be less than significant,are <br /> summarized in Table 2-1 in Chapter 2,Executive Summary,of this document. <br /> RMC Pacific vemalis Quarry Mining and Reclamation Project 6-19 ESA/203015 <br /> Draft Environmental Impact Report May 2006 <br />