Laserfiche WebLink
k r <br /> 1.Description of Proposed Revision: <br /> Develo meat D artment—(staff contact:Kai Luoma @ 468-9567) <br /> A.) Revise Condition 1-n. to allow the beginning <br /> to reclaim the phasef reclarnation, of an excavated <br /> phase,to be delayed until such time it is feasible <br /> B.) Revise Condition 1-u to allow the applicant to store water, <br /> ethe initial <br /> processing pond, at a level above the invert of the Delta Mendota <br /> addition, the applicant would like to amend the original application to show a <br /> change in location of the initial settling pond and the addition of a dike j <br /> surrounding this pond.(See attached pians). <br /> Public Works—(staff contact: Gabe Karam @ 468-3023) <br /> A.) Revise Condition 2-a-1 by striking out the words"either Koster Road of from the <br /> text of the condition. <br /> B.) Revise Condition 2-c by striking out the words"Koster Road' from the text of the <br /> condition. <br /> C.) Revise Condition 2-d by striking out the words "Koster Road'(including bridge)" <br /> (paragraph 1), "bond" (paragraph 2), and "Koster Road" (paragraph 2) from the <br /> text of the condition. Where the word "bond" is stricken, replace it with the word <br /> "security". Also add the words "and form" to the. first line of the second <br /> paragraph, and the words "along the haul route" to the third line of the second <br /> paragraph(as indicated in the attached revised conditions). <br /> D.) Revise Condition 2-f by striking out the entire lead paragraph, all of item #1, and <br /> the words "If the entrance to the project site is located on Blewett Road" of item <br /> #2. <br /> E.) Revise Condition 2-g by striking out the words"Koster Road" from the text of the <br /> condition. <br /> 2. State the facts showing the changes in circumstances which make the subject <br /> condition(s) no longer appropriate or necessary: <br /> Development De artment(staff contact: Kai Luoma @ 468.9567) <br /> A.) Condition 1-n requests that reclamation of one phase commences prior to the <br /> beginning of excavation of the next phase. In the applicants case this would not <br /> be feasible. The bottom of each phase of excavation will become the settling <br /> pond area for the next phase of excavation. During this time, the settling ponds <br /> k on the bottom of the completed phase of excavation will be filling with the silts <br /> and clays from the washing of aggregates. Upon the completion of pond use, in <br /> any phase, the ponds would be allowed to dry, and then reclamation will begin <br /> I <br />