My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0004149
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
K
>
KOSTER
>
36869
>
2600 - Land Use Program
>
QX-96-0001
>
SU0004149
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/27/2020 1:00:10 PM
Creation date
9/6/2019 10:44:51 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0004149
FACILITY_NAME
QX-96-0001
STREET_NUMBER
36869
Direction
S
STREET_NAME
KOSTER
STREET_TYPE
RD
City
TRACY
ENTERED_DATE
5/12/2004 12:00:00 AM
SITE_LOCATION
36869 S KOSTER RD
RECEIVED_DATE
9/22/1996 12:00:00 AM
QC Status
Approved
Scanner
SJGOV\wng
Supplemental fields
FilePath
\MIGRATIONS\K\KOSTER\36869\QX-96-01_EIR 96-3\SU0004149\PUB REC REL APPL.PDF
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
782
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
U <br /> 2.3 ISSUES TO BE RESOLVED <br /> Section 15123 of the CEQA Guidelines requires the summary section of an EIR to include <br /> "issues to be resolved including choices among alternatives and whether and how to <br /> mitigate significant effects." The following issues fit this requirement: . <br /> ■ Ability to reclaim prime agricultural land to a productivity level equal to or greater <br /> than pre-mining levels or to levels based upon productivity levels for similar crops <br /> in the area. <br /> ■ Mitigation of truck traffic created by the project through gaining access from the <br /> proposed Bird Roadl1-5 interchange (as evaluated in Alternative 3), including <br /> potential shared financial responsibilities in order for the new interchange to be <br /> constructed. <br /> 2.4 SUMMARY OF REGULATORY/POLICY CONSISTENCY <br /> Section 15125(b) of the CEQA Guidelines requires the EIR to discuss "any inconsistencies j <br /> between the proposed project and applicable general plans and regional plans." A number w <br /> of regulations and plans exist that address conservation and development of aggregate <br /> resources and related issues, including the California Surface Mining and Reclamation Act, <br /> the State Mining and Geology Board regulations, and the San Joaquin County <br /> Development Title. A discussion of the consistency between the project and these <br /> regulations is provided in Section 7.2. F <br /> 2.5 SUMMARY OF ALTERNATIVES <br /> The following alternatives are described in Chapter 3.0 and given an equal level of <br /> environmental analysis in Chapter 4.0. <br /> Alternative 1: Proposed Project <br /> Alternative 2: Proposed Project with Alternate Northern Access Road <br /> Alternative 3: Proposed Project with Alternate Southern Access Road to New <br /> Interchange <br /> Alternative 4: No Project <br /> 2.6 SUMMARY OF IMPACTS , <br /> Table 2-1 (Summary of Impacts and Mitigation Measures) has been organized to <br /> correspond with environmental issues discussed in Chapter 4.0. The summary table is <br /> arranged in four columns: <br /> Draft Environmental Impact Report 2-2 ER-96-3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.