Laserfiche WebLink
- . - C1 <br /> `Objectives of the County <br /> The County's objectives regarding extractive resources are identified in the San Joaquin <br /> "+ County General Plan 2010 (July 1992). <br /> 1. To protect extractive resources from urban development or encroachment. <br /> ` 2. To provide for the production of extractive resources while protecting people, <br /> property, and the environment from hazards caused by resource extraction (Vol. I, ;! <br /> p. Vi-16). <br /> County policies require the lands within the project site remain in open space uses until <br /> ¢ r 'extraction of resources occurs, and following mining, that those lands be reclaimed in an <br /> ~`` environmentally sound manner as soon as reasonably possible. <br /> ' I <br /> 3.4 PROJECT COMPONENTS AND CHARACTERISTICS ! <br /> Introduction <br /> f The following discussion provides a description of the proposed project, including facilities, <br /> phasing, and reclamation plans. Plan and section views of the proposed operations <br /> showing phases of excavation and process plant construction are provided in Figures 3-3 <br /> through 3-7. <br /> P I Production Schedule <br /> The following is a table of estimated production of both aggregates and asphalt concrete <br /> production. <br /> Table 3-1 <br /> Aggregate Products Production and Sales per Year <br /> r (in tons) <br /> Product 1998 2005 2054 <br /> Aggregate Production 300,000 500,000 600,000 <br /> i s F Including Asphalt Agg. <br /> Asphalt Production 100,000 150,000 200,000 <br /> Quarry Excavation 350,000 1 650,000 1 700,000 <br /> Stripping Excavation 50,000 50,000 25,000], <br /> .I <br /> �� II <br /> f Draft Environmental Impact Report 3-7 - - ER-96-3 <br /> I� <br />