My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0004149
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
K
>
KOSTER
>
36869
>
2600 - Land Use Program
>
QX-96-0001
>
SU0004149
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/27/2020 1:00:10 PM
Creation date
9/6/2019 10:44:51 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0004149
FACILITY_NAME
QX-96-0001
STREET_NUMBER
36869
Direction
S
STREET_NAME
KOSTER
STREET_TYPE
RD
City
TRACY
ENTERED_DATE
5/12/2004 12:00:00 AM
SITE_LOCATION
36869 S KOSTER RD
RECEIVED_DATE
9/22/1996 12:00:00 AM
QC Status
Approved
Scanner
SJGOV\wng
Supplemental fields
FilePath
\MIGRATIONS\K\KOSTER\36869\QX-96-01_EIR 96-3\SU0004149\PUB REC REL APPL.PDF
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
782
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
f <br /> Table 4.4-6: Intersection Levels of Service With Project Mitigation <br /> Cumulative Conditions -AM Peak Hour <br /> Intersection Alternative 1 Alternative 2 Alternative 3 No Project II <br /> LOS Delay LOS Delay LOS Delay I Delay E <br /> 3 Eastbound SR 1321 Koster Road (with divided SR 132) i1 <br /> NB B 8.7 B 7.5 - - B 7.5 <br /> SB B 8.5 B 8.0 g 7.7 <br /> EB A �: 0.0 A 0.0 - - A 0.0 <br /> 4 Westbound SR 132/ Koster Road (with divided SR 132) <br /> NB Thru D 23.0 D 23.0 - - D 22.6 <br /> NB Left* D 49 (mph) 49 (mph) - - D 49 (mph) <br /> SB D 23:3 D 23.3 - - D 22.9 <br /> WB A 2.1 C 17.8 - - A 2.1 I' <br /> ' 8 Bird Road / 1-5 SB Ramps (with a traffic signal) <br /> Average _ - - - - C 18.8 C 18.9 <br /> " This approach was analyzed using the HCM methodology for ramp merges. <br /> r Mitigation Measure 4.4-3a (Alternatives 1 and 2) <br /> The proponent shall improve the SR 1321Koster Road intersection to include a <br /> 4 F divided highway section with one left-tum lane, one through lane, and one right-tum <br /> lane in each direction on SR 132. Koster Road shall have one through lane and <br /> one right-tum lane in the northbound_direction south of the intersection. The <br /> 1- < improvement plans and specifications shall be prepared by a registered civil <br /> engineer and shall be subject to approval by the San Joaquin County Department <br /> of Public Works and by Caltrans. <br /> Level of Significance After Mitigation.- <br /> Implementation <br /> itigation:Im lementation of Mitigation Measure 4.4-3a would reduce Alternatives I and 2s <br /> effect on intersection LOS to a less-than-significant level <br /> Mitigation Measure 4.4-3b (Alternative 3) <br /> 1 , <br /> A traffic signal shall be included in the design of the Vernalis interchange at the i <br /> intersection of the southbound 1-5 ramps with relocated Bird Road. The proponent <br /> shall pay a fair share portion of the cost of the signal. <br /> Level of Significance After Mitigation: <br /> Implementation of Mitigation Measure 4.4-3b would reduce Alternative 3's effect ect on � <br /> intersection LOS to a less-than-significant level <br /> i <br /> i, <br /> r Draft Environmental Impact Report 4-53 ER-96-3 <br /> k <br /> I <br />
The URL can be used to link to this page
Your browser does not support the video tag.