Laserfiche WebLink
Page 2 <br /> #4X-9b-1 <br /> - Consistent with recent prior studies,we further believe that widening the e)dsting Blewett Road <br /> bridge over l-5 with improvements to SR 132/Bird Road intersection including a bridge over the <br /> freeway and ramps would be needed if Btewett Road were studied as an alternate route. The short <br /> distance between the 1-5 branch connections and the Bird Road ramps needs to be studied as well. <br /> The existing Freeway Agreement shows a new interchange proposed and right of way <br /> acquired for fight diamond ramps and till for Bird Road to go over the Sit 132 r <br /> We appreciate the opportunity to comment on the application and look forward to working with x <br /> you an this project Any questions regarding this review may be directed to Chris Sayre of my staff at <br /> (249) 948-7142 <br /> Sincerely, <br /> DANA COWELL <br /> Chief, Transportation <br /> Planning Branch B <br /> cc: Bart Meays/SJCOG <br /> Chet Davisson/Sart Joaquin County <br /> Kerry Suflivan/SJ County Community Development <br /> a <br />