Laserfiche WebLink
1---� fflitial Study—LID Annexation <br /> For the provision of sewer and water services, agricultural impacts were analyzed in the Lathrop Water, <br /> Wastewater and Recycled Water Master Plan EIR (Master Plan EIR), River Islands EIR and for sewer <br /> and recycled water, the Phase I Expansion of Water Recycling Plant No. 1 EIR and LAFCO's LID <br /> Formation Initial Study/MND. All of these documents are incorporated by reference. Any impacts <br /> associated with these services would be mitigated by the mitigation measures identified in these previous <br /> documents and no additional analysis is necessary. Copies of the documents are available in the San <br /> Joaquin County Community Development Department Office. <br /> The proposed project does not involve substantial changes to the Project which will require major <br /> revisions of the prior environmental documents due to the involvement of new or substantially more <br /> severe environmental impacts because the LID formation and the LID's provision of services previously <br /> were evaluated in the prior environmental documents. Further, there are no substantial changes with <br /> respect to the circumstances in which the project will be undertaken that would involve new or more <br /> intensive impacts in this issue area. Finally,there is no new information of substantial importance, which <br /> was not known and could not have been known when the prior environmental documents were prepared, <br /> that indicates that the project would have new or more severe aesthetic impacts or that considerably <br /> different or feasible mitigation measures are available that the LID declines to implement. The proposed <br /> project would not require additional mitigation measures to avoid new significant environmental effects. <br /> For these reasons,no further analysis is required. <br /> 2.1.4 Agriculture—Mitigation Measures <br /> None proposed. <br /> 2.1.5 Agriculture-References <br /> City of Lathrop(Grunwald and Associates). Comprehensive General Plan & Environmental Impact <br /> Report. As amended through January 28, 2003. SCH#1991022059 <br /> City of Lathrop (Grunwald and Associates). Draft and Final Environmental Impact Report for the <br /> West Lathrop Specific Plan. 1996. SCH# 1993112027 <br /> City of Lathrop(EDAW, Inc.). Draft and Final Environmental Impact Report for the River Islands <br /> at Lathrop Project. Certified January 28,2003. SCH# 1993112027 <br /> City of Lathrop (EDAW, Inc.). Draft and Final Environmental Impact Report for the Phase I <br /> Expansion of Water Recycling Plant No. 1. 2003. SCH# 1993112027 <br /> San Joaquin County LAFCo. Mitigated Negative Declaration for the Lathrop Irrigation District <br /> Formation. Adopted November 10,2001. <br /> 2.3 Air Quality <br /> This section discusses local and regional air quality conditions and an analysis of potential air quality <br /> impacts associated with the proposed project. Mitigation measures are recommended,as necessary,to <br /> reduce potentially significant adverse air quality impacts that are related to construction activity.The <br /> information contained in this section is based, in part,on documents prepared by the San Joaquin Valley <br /> Air Pollution Control District(SJVAPCD), U.S. Environmental Protection Agency(EPA),California Air <br /> 22 <br />