My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0005222 (2)
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CITY OF LATHROP
>
0
>
2600 - Land Use Program
>
PA-0500408
>
SU0005222 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/2/2020 11:17:08 AM
Creation date
9/6/2019 10:48:20 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0005222
PE
2675
FACILITY_NAME
PA-0500408
STREET_NUMBER
0
STREET_NAME
CITY OF LATHROP
City
LATHROP
APN
MANY
ENTERED_DATE
7/22/2005 12:00:00 AM
SITE_LOCATION
CITY OF LATHROP
RECEIVED_DATE
7/22/2005 12:00:00 AM
P_LOCATION
07
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\wng
Supplemental fields
FilePath
\MIGRATIONS\L\LATHROP\0\PA-0500408\SU0005222\DEIR.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
155
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
N%.V rnitiai Study—LID Annexation <br /> Air Ouality Mitigation 1: In accordance with SJVAPCD guidelines(SJVAPCD 1998),the following <br /> mitigation,which includes SJVAPCD Basic,Enhanced, and Additional Control Measures, shall be <br /> incorporated and implemented during all construction related activities: <br /> All disturbed areas, including storage piles,which are not being actively utilized for <br /> construction purposes, shall be effectively stabilized of dust emissions using water, <br /> chemical stabilizer/suppressant, or vegetative ground cover. <br /> All onsite unpaved construction roads and offsite unpaved construction access roads shall <br /> be effectively stabilized of dust emissions using water or chemical stabilizer/suppressant. <br /> All land clearing,grubbing, scraping,excavation, land leveling,grading, cut and fill,and <br /> demolition activities shall be effectively controlled of fugitive dust emissions utilizing <br /> application of water or by presoaking. During demolition of buildings all exterior <br /> surfaces of the building shall be wetted. <br /> When materials are transported offsite,all material shall be covered, effectively wetted to <br /> limit visible dust emissions, or at least 6 inches of freeboard space from the top of the <br /> container shall be maintained. <br /> All operations shall limit or expeditiously remove the accumulation of mud or dirt from <br /> adjacent public streets at least once every 24 hours when operations are occurring. The <br /> use of dry rotary brushes is expressly prohibited except where preceded or accompanied <br /> by sufficient wetting to limit the visible dust emissions. Use of blower devices is <br /> expressly forbidden. <br /> - Following the addition of materials to,or the removal of materials from,the surfaces of <br /> outdoor storage piles, piles shall be effectively stabilized of fugitive dust emissions <br /> utilizing sufficient water or chemical stabilizer/suppressant. <br /> - Onsite vehicle speeds on unpaved roads shall be limited to 15 mph. <br /> - Sandbags or other erosion control measures shall be installed to prevent silt runoff to <br /> public roadways from adjacent project areas with a slope greater than 1 percent. <br /> - Wheel washers shall be installed for all exiting trucks and equipment,or wheels shall be <br /> washed to remove accumulated dirt prior to leaving the site. <br /> - Excavation and grading activities shall be suspended when winds exceed 20 mph. <br /> - The overall area subject to excavation and grading at any one time shall be limited to the <br /> fullest extent possible. <br /> - Onsite equipment shall be maintained and properly tuned in accordance with <br /> manufacturers'specifications. <br /> - When not in use, onsite equipment shall not be left idling. <br /> 23.4 Air Quality-References <br /> California Air Resource Board(ARB). 1994. California Surface Wind Climatology. Sacramento, <br /> California. <br /> City of Lathrop(Grunwald and Associates). Comprehensive General Plan &Environmental Impact <br /> Report.As amended through January 28,2003. SCH#1991022059 <br /> City of Lathrop (Grunwald and Associates). Draft and Final Environmental Impact Report for the <br /> West Lathrop Specific Plan. 1996. SCH# 1993112027 <br /> City of Lathrop(EDAW, Inc.). Draft and Final Environmental Impact Report for the River Islands <br /> at Lathrop Project. Certified January 28,2003. SCH# 1993112027. <br /> 25 <br />
The URL can be used to link to this page
Your browser does not support the video tag.