Laserfiche WebLink
'rWitial Study—LID Annexation <br /> sewer and recycled water, the Phase I Expansion of Water Recycling Plant No. 1 EIR and LAFCO's LID <br /> Formation Initial Study/MND. All of these documents are incorporated by reference. Any impacts <br /> associated with these services would be mitigated by the mitigation measures identified in these previous <br /> documents and no additional analysis is necessary. Copies of the documents are available in the San <br /> Joaquin County Community Development Department Office. <br /> The proposed project does not involve substantial changes to the Project which will require major <br /> revisions of the prior environmental documents due to the involvement of new or substantially more <br /> severe environmental impacts because the LID formation and the LID's provision of services previously <br /> were evaluated in the prior environmental documents. Further, there are no substantial changes with <br /> respect to the circumstances in which the project will be undertaken that would involve new or more <br /> intensive impacts in this issue area. Finally, there is no new information of substantial importance, which <br /> was not known and could not have been known when the prior environmental documents were prepared, <br /> that indicates that the project would have new or more severe aesthetic impacts or that considerably <br /> different or feasible mitigation measures are available that the LID declines to implement. The proposed <br /> project would not require additional mitigation measures to avoid new significant environmental effects. <br /> For these reasons,no further analysis is required. <br /> 2.13.3 Public Services—Mitigation Measures <br /> None required. <br /> 2.13.4 Public Services-References <br /> City of Lathrop(Grunwald and Associates). Comprehensive General Plan&Environmental Impact <br /> Report. As amended through January 28,2003. SCH#1991022059 <br /> City of Lathrop(Grunwald and Associates). Draft and Final Environmental Impact Report for the <br /> West Lathrop Specific Plan. 1996. SCH# 1993112027 <br /> City of Lathrop(EDAW, Inc.). Draft and Final Environmental Impact Report for the River Islands <br /> at Lathrop Project. Certified January 28, 2003. SCH# 1993112027. <br /> City of Lathrop. West Lathrop Specific Plan.As amended January 28,2003 <br /> San Joaquin County LAFCo. Mitigated Negative Declaration for the Lathrop Irrigation District <br /> Formation. Adopted November 10,2001. <br /> 2.14 Recreation <br /> The River Islands project will create the need for and provide a number of recreational opportunities, in <br /> the form of traditional parks,open space,trails, internal waterways and lakes,backbay boat facilities and <br /> other amenities. However,the proposed Project does not involve recreation, nor does it cause a direct or <br /> indirect impact on recreational facilities and programs. <br /> 2.14.1 Regulatory Background <br /> The Resource Management Element of the City of Lathrop General Plan includes several policies and <br /> standards related to recreation. However, none of these policies affect the proposed Project. The City <br /> 58 <br />