Laserfiche WebLink
oR{t4!N � <br /> e < P.O.BOC 1810- ALI E.O NIAHAZELTON AVENUE <br /> THOMAS R. FLINN <br /> '. DIRECTOR STOCK ON,68-3 CALIFORNIA)468-2999 <br /> y 201-3018 <br /> (209)468-3000 FAX(209)468-2999 <br /> w .co.san-joaquin.ca.us <br /> THOMAS M.GAU <br /> DEPUTY DIRECTOR <br /> MANUEL SOLORIO Working The YOU <br /> DEPUTY DIRECTOR <br /> STEVEN WINKLER <br /> DEPUTY DIRECTOR <br /> BENTON ANGOVE <br /> BUSINESS ADMINISTRATOR <br /> RECIR/F® <br /> July 25,2005 JUL 2 7 200.5 <br /> MEMORANDUM CommunKy Development Dept. <br /> TO: Chandler Martin, Deputy Director <br /> Community Development Department <br /> CONTACT PERSON: Rick Griffin <br /> FROM: Dean Gilman,Engineer IV � <br /> Public Services Division /�/� <br /> SUBJECT: PA-05-385 A MINOR SUBDIVISION APPLICATION TO SUBDIVIDE AN EXISTING <br /> 245-ACRE PARCEL INTO SIX (6)40-ACRE PARCELS,LOCATED ON THE EAST CORNER <br /> OF LIBERTY ROAD AND JACK TONE ROAD. (SUPERVISORIAL DISTRICT 4) <br /> PROPERTY OWNER: James Gribaudo APPLICANT: Monte K. Seibel <br /> ADDRESS: 13888 E. Liberty Road APN: 021-020-12 and 15 <br /> INFORMATION: <br /> A portion of the site is currently located within a Federal Flood Insurance Administration Designated Flood <br /> Hazard Area. The 100-year Flood Elevation will be as determined by StormWater Management Division. <br /> Liberty Road has an existing right-of-way width of 60 feet and a planned right-of-way width of 84 feet.Jack <br /> Tone Road has an existing right-of-way width of 60 feet and a planned right-of-way width of the same. <br /> The Traffic Impact Mitigation Fee shall be required when parcels are developed. The fee is due and payable at <br /> the time of building permit application. <br /> RECOMMENDATIONS: <br /> 1. The Parcel Map requirement is waived. A Certificate of Compliance is required. <br /> (Development Title Section 9-890.4) <br /> 2. All easements of record shall be described on the"Certificate of Compliance". <br /> (Development Title Section 9-910.20) <br /> NOTES: Any construction activity that results in the disturbance of at least one (1)acre of soil shall require a <br /> State NPDES construction permit. <br /> This area has been subject to historic flooding and it is located within a Federal Emergency <br /> Management Agency's(FEMA's)Designated Flood Hazard area (100-year floodplain)where base <br /> flood elevations are not determined. Therefore,the applicant shall obtain a finished floor elevation <br /> from San Joaquin County Department of Public Works Stormwater Management Division for all <br /> new structures or substantial improvements constructed on all parcels. <br />