Laserfiche WebLink
4�AHIM._�, � <br /> P.O. BOX 1810-1810 E.HAZELTON AVENUE <br /> THOMAS R. FLINN Y� STOCKTON,CALIFORNIA 95201 <br /> a`. _ !• DIRECTOR �"" o Y" <br /> (209)468-3000 FAX(209)488-2999 <br /> e " +`� www.s ov.or / ubworks <br /> �ie6k 19 9P <br /> THOMAS M.GAU <br /> CHIEF DEPUTY DIRECTOR <br /> MANUEL SOLORIO waddIlg for YOU <br /> DEPUTY DIRECTOR <br /> STEVEN WINKLER <br /> DEPUTY DIRECTOR ®p <br /> ROGER JANES R EC E I VE D <br /> BUSINESS ADMINISTRATOR <br /> FEB 2 1 2008 <br /> February 15, 2008 CommunKy Developrwent Dept. <br /> MEMORANDUM <br /> TO: Rick Griffin, Senior Planner <br /> Community Development Department <br /> CONTACT PERSON: Kerry Sullivan <br /> FROM: Bill DuBois, Engineer III <br /> Public Services Division <br /> SUBJECT: PA-08-002 AN IMPROVEMENT PLAN APPLICATION TO CONSTRUCT A 10,000 SQUARE <br /> FOOT AIRCRAFT HANGER AT STOCKTON METRO AIRPORT,TO INCLUDE AN OFFICE, <br /> KITCHEN, SHOP,RESTROOMS AND ABOVE GROUND FUEL TANK, LOCATED ON THE <br /> NORTH SIDE OF LINDBERGH STREET, 1,200 FEET WEST OF LOCKHEED STREET. <br /> (SUPERVISORIAL DISTRICT 1) <br /> PROPERTY OWNER: San Joaquin County APPLICANT: Terry Clark <br /> ADDRESS: 6768 S. Lindbergh Street APN: 177-260-26 <br /> INFORMATION: <br /> The site is currently located within a Federal Flood Insurance Administration Designated Flood Hazard Area. The <br /> 100 year Flood Depth will be approximately one (1) foot above the natural ground elevation. <br /> RECOMMENDATIONS: <br /> 1. The Traffic Impact Mitigation Fee shall be required for this development. The fee is due and payable at the time <br /> of building permit application. (The fee currently is $223.44 per additional daily trip-end generated in the <br /> Stockton area. The fee shall be automatically adjusted July 1 of each year by the Engineering Construction Cost <br /> Index as published by the Engineering News Record.) (Resolution R-00-433) <br /> 2. The Regional Transportation Impact Fee shall be required for this development. The fee is due and payable at the <br /> time of building permit application. The fee is based on the current schedule. (Resolution R-06-38) <br />