Laserfiche WebLink
1 <br /> fit+ <br /> p4ul� <br /> P.O.BOX 1810-1810 E.HAZELTON AVENUE <br /> THOMAS R. FLINN STOCKTON,CALIFORNIA 95201 <br /> DIRECTOR ,CJS" (209)468 3040 FAX(209)468-2999 <br /> k www.sjgov.org/pubworks <br /> + 46FO P� <br /> I <br /> THOMAS M.GAU <br /> CHIEF DEPUTY DIRECTOR gq�; "' <br /> T7„E� a YOU�® - <br /> MANUEL SOLORIO <br /> DEPUTY DIRECTOR <br /> STEVEN wINKLER , <br /> DEPUTY DIRECTOR <br /> ROGER JANES R Ec E iiI VED <br /> BUSINESS ADMINISTRATOR <br /> i <br /> MAY t 5 2008 <br /> May 13, 2008 r'Ofl`lCl Unity D840pment Dept. <br /> MEMORANDUM <br /> ' TO: Rick Griffin, Senior Planner <br /> Community Development Department <br /> CONTACT PERSON: Jason Jones <br /> FROM: Bill DuBois, Engineer III t. <br /> Public Services Division <br /> i <br /> SUBJECT: PA-08-113 A SITE APPROVAL APPLICATION TO EXPAND AN EXISTING CONCRETE PIPE <br /> MANUFACTURING COMPANY TO INCLUDE A 12,851 SQUARE FOOT BUILDING,LOCATED <br /> ON THE SOUTH SIDE OF LINNE ROAD, 1,100 FEET EAST OF TRACY BOULEVARD <br /> (SUPERVISORIAL DISTRICT 5) <br /> PROPERTY OWNER: Ameron Inc. APPLICANT: James Kachevas <br /> i <br /> ADDRESS: 10100 W Linne Road APN: 253-120-41 <br /> INFORMATION: <br /> The site is not currently located within a Federal Flood Insurance Administration Designated Flood Hazard Area. <br /> I. <br /> Linne Road has an existing right-of-way width of 50 feet and a planned right-of-way width of 84 feet. <br /> i RECOMMENDATIONS: <br /> i <br /> 1. An encroachment permit shall be required for work within road right-of-way. <br /> (Development Title Sections 9-1145.4 and 9-1145.5) <br /> 2. Any new driveway approach shall be improved in accordance with the requirements of San Joaquin County <br /> Standards R-17 prior to issuance of the occupancy permit. (Development Title Section 9-1145.5) <br /> i 3. The Traffic Impact Mitigation Fee shall be required for this development. The fee is due and payable at the <br /> time of building permit application. (The fee currently is $897.00 per 1,000 gross square foot of building <br /> designated as Manufacturing in the Tracy area. The fee shall be automatically adjusted July 1 of each year by <br /> the Engineering Construction Cost Index.,as published by the Engineering News Record.) (Resolution R-00- <br /> 433) <br />