Laserfiche WebLink
Rick Griffin _2- <br /> COMMUNITY DEVELOPMENT <br /> PA-08-076 (SA) <br /> 4. The Regional Transportation Impact Fee shall be required for this development. The fee is due and payable at <br /> the time of building permit application. The fee currently is $830.00 per 1,000 gross square foot of building <br /> designated as Manufacturing. The fee is based on the current schedule. (Resolution R-06-38) <br /> 5. A copy of the Final Site Plan shall be submitted prior to release of building permit. <br /> 6. Verification shall be obtained from the Solid Waste Division (468-3066) that this development has met the <br /> requirements of the Waste Plan Format for Development Projects. Final Site Plan is required upon submittal <br /> of verification. <br /> 7. Dischargers whose projects disturb 1 or more acres of soil or whose projects disturb less than 1 acre but are <br /> part of a larger common plan of development that in total disturbs 1 or more acres, are required to obtain <br /> coverage under the General Permit for Discharges of Storm Water Associated with Construction Activity <br /> kConstruction General Permit, 99-08-DWQ). Construction activity subject to this permit includes clearing, <br /> grading and disturbances to the ground such as stockpiling, or excavation, but does not include regular <br /> maintenance activities performed to restore the original line, grade, or capacity of the facility. <br /> BD:SS:av <br /> 15pw rvfp0l1ShueslDevServices\DPubSav\COMMENTS\SAVYr 20081PA-0B00113 APP.doc <br /> i <br /> r <br />