Laserfiche WebLink
FoRst 103 SUBMIT IN DUPLICATE Aoaa <br /> •cwuecss wasncr or cwuros.sa <br /> ocrwltrYmr or Cb MsuvAnoM <br /> DIVISION OF OIL AND GAS <br /> History of Oil or Gas Well <br /> OPERATOR Great Basins Petroleum Co. _FIELD. .. -----__---.-__ <br /> well Na T.IA_& W_d 2 6-9 ---.., Sec..— 9 ---•T.-3S- R 6 —•- ���-B.&M. <br /> Dace.--December 1 -------• l9_Z_0- Signed--------t -- <br /> 1011 Gateway West, Century City R. G. Greene <br /> Los Angeles, California 90067 (213) 879-0666Tide___ghairman of_the_Board <br /> __---___..-___ <br /> (Addrm) (Lbpham N.1,.,) (pudd ne,Sten,."or Apaq <br /> It is of the greatest impotence to have a complete history of the well.Use this form to report a full account of all important operations during the <br /> drilling and t"sing of the well or during re-drilling, altering of casing, plugging,or abandonment with the dues thereof. Be sure to include such items <br /> as hole site, formuion test details, amounts of cement used, top and bottom of plugs, perforation details, sidetracked junk, bailing tests, shooting and <br /> initial production data. <br /> Not <br /> 11/17/70 Beeline Drilling Co. moved in Rig #1 and rigged up. Jim Fincher, toolpusher. <br /> Spudded in and drilled 12-1/4" hole to 185' . <br /> 11/18/70 Drilled 12-1/4" hole to 996' . Wiped hole for casing: Ran 24 joints 8-5/8" 24# <br /> K-55 new Armco ST&C 8 rd thd. seamless casing and cemented at 996' with 350 <br /> sacks class "G" cement premixed with 4% gel followed by 100 sacks class "G" <br /> cement treated with 3% calcium chloride. Used one top rubber plug and displaced <br /> to 956' with 347 of water. Had full circulation throughout with 200 cf cement <br /> returns to surface. C.I.P. 4:06 P.M. 11/18/70, B.J. Service. Casing equipped <br /> with Baker guide shoe and 1 centralizer latched over first collar. Bakerlok'd shoe <br /> and first collar. Cut off conductor and installed 8" series 900 casing flange. <br /> Tested welds to 3000 psi, okay. <br /> Totco Survey: 996' 0015' . <br /> 11/19/70 Installed BOPS. Tested blind rams to 1500 psi, okay. Ran in with 7-7/8" drilling <br /> assembly and found T.O.C. 926' . Tested casing, pipe rams and kelly cock to <br /> 1500 psi, okay. Drilled out cement and shoe and drilled 7-7/8" hole to 1331' . <br /> Lost and recovered drillcollars at 1331' . <br /> 11/20/70 Drilled 7-7/8" hole to 2901' . Sidetracked junk at 1331' . <br /> 11/21/70 Drilled 7-7/8" hole to 3942' . Conditioned mud for drillstem test #1 . Mud: 74#/cf; <br /> 43 secs.; 6.0 cc; 3% sand. <br /> Totco Survey: 3078' 0 30' . <br /> i <br /> 11/22/70 DST #1 (3918'-3942'): Ran Johnston MFE tool on 4 stands 5-3/4" D.C. on 4" D.P. , <br /> +JII dry. Set packers at 3912' & 3918' with perforated anchor to 3942' . Opened 1/2" <br /> BHC 8:12 A.M. 11/22/70 and took 5 minute preflow. Had light blow of air through- <br /> out. Took 31 minute initial shut-in pressure and opened for flow test on 5/16" <br /> choke nipple at 8:48 A.M. Had light blow of air with GTS 7 minutes . Reduced <br /> choke size to 3/16" at 9:01 A.M. Had gas at a maximum and final rate of 130 MCFD <br /> with 153 psi on 3/16" surface choke at the end of the 1 hr. 15 min. flow period. <br /> Took 20 minute FSIP and pulled tools . Recovered 4' rise thick drilling mud. <br /> Pressure bomb charts showed mild intermittent plugging throughout flow period. <br />