Laserfiche WebLink
-2- <br /> 11/22/70 Bomb Depth 3930 <br /> Cont'd 393 6' <br /> IHP 2200 2234 <br /> ISIP 1785 1804 <br /> IFP 185 208 <br /> FFP 277 290 <br /> FSIP 1742 1727 <br /> FHP 2188 2163 <br /> 11/23/70 Drilled 7-7/8" hole to 3982' . Conditioned mud for test. DST #2 (3971'-3982'): <br /> Ran Johnston MFE tool on 7 stands 5-3/4" D.C. on 4" D.P. , dry. Set packers <br /> 3965' & 3971' with perforated anchor to 3982' . Opened 1/2" B.H.C. 3:47 P.M. <br /> 11/23/70 and took 3 minute preflow. Had strong blow of air with GTS 2 minutes. <br /> Took 15 minute ISIP. Opened for flow test at 4:05 A.M. Closed in to stop D.P. <br /> leaks after flowing 5 mins. on 5/16" C.N. , 18 mins . on 3/8" C.N. and 5 mins. <br /> on 1/2" C.N. Had clean gas at maximum and final rate of 2850 MCFD on 3/8" <br /> C.N. and 3350 MCFD on 1/2" C.N. and building. Took 18 minute FSIP. Pulled <br /> tools and had no fluid recovery. Pressure bomb charts confirmed test results <br /> and showed the well was nearly stabilized on the 3/8" surface choke at a <br /> 2850 MCFD rate with 840 psi surface and 1101 psi bottom-hole flowing pressures. <br /> On the 1/2" surface choke, at a final rate of 3350 MCFD, the bottom-hole flowing <br /> pressure was 868 psi and building sharply. <br /> Bomb Depth 3945' 3976' <br /> IHP 2139 2128 <br /> ISIP 1834 1822 <br /> IFP 429 420 <br /> FFP 857 868 <br /> FSIP 1803 1804 <br /> FHP, 2133 2122 <br /> Drilled 7-7/8" hole to 4642' . <br /> Mud: 74#/cf; 44 secs .; 7.4 cc; 10. 1 ph; 1°% sand. <br /> 11/24/70 Drilled 7-7/8" hole to 5343' . Mud: 77-1/2#/cf; 45 secs. <br /> Totco Survey: 4860' O048' . <br /> 11/25/70 Drilled 7-7/8" hole to 5757' . Mud: 78#/cf; 44 secs.; 5.8 cc; 2/32" F.C.; <br /> 1-1/4% sand; 10.0 pH. <br /> Totco Survey: 5446' 0030'; 5757' 0045' . <br /> 11/26/60 Drilled 7-7/8" hole to 6201' total depth. Conditioned mud for IES log. Mud: <br /> 78#/cf; 45 secs.; 5.8 cc; 2/32"; 1/2% sand; 10.2 pH. <br /> Totco Survey: 6201' O045' . <br /> 11/27/70 Ran Schlumberger IES log. Laid down DCs. Ran D.P. open-ended to 4350'. <br /> Mixed 60 sacks class "G" cement treated 3% calcium chloride and equalized <br /> at 41481 . C.I.P. 4:25 P.M. 11/27/70. Halliburton. Ran bit on one stand <br /> 5-3/4" collars to 4150' and conditioned mud for casing. <br />