Laserfiche WebLink
-2- <br /> Kc77 <br /> t Paulson f14-9 <br /> 9/17/70 a total flow period of 44 minutes. Took 25 minute final shut-in pressure. Pulled <br /> Cont'd. - tools with no fluid recovery. Pressure bomb charts confirmed results of test. <br /> Bomb depth: 3886' 3909' <br /> IHP 2139 2075 <br /> ISIP 1803 1775 <br /> IFP on 5/16" C.N. 1510 1480 <br /> FFP on 5/16" C.N. 1528 1527 <br /> Intermediate SIP 1815 1786 <br /> IFP on 1/2" C.N. 1162 1254 <br /> FFP on 1/2" C.N. 1376 1374 <br /> FSIP 1797 1951 <br /> FHP 2078 2016 <br /> Drilled 7-7/8" hole to 4358' . Mud: 73#; 45 secs.; 5.4 cc; 1/32"; trace sand; <br /> 48 G/G; 0.5 Pf. <br /> 9/18/70 Drilled 7-7/8" hole to 4969' total depth. Ran Schlumberger IES log. <br /> Totco survey: 4421' O0151 . <br /> 9/19/70 With open-ended drillpipe hung at 4408', mixed 50 sacks class "G" cement <br /> treated with 3% calcium chloride and equalized at 4240' . Ran 20 of water <br /> ahead and 5 of water behind and displaced with 253 cf mud. C.I.P. 1:05 P.M. <br /> 9/19/70. B. J. Service. Laid down drill collars and drillpipe. Ran 109 Joints <br /> 4-1/2" 9.50# K-55 8 rd. thd. ST&C new Armco seamless casing and cemented <br /> at 4119' with 250 sacks class G" cement treated with 0.75% D-31. Used <br /> 1 top and 1 bottom rubber plug and displaced with 380 of mud. Ran 75 of water <br /> and 50 of mud flush ahead. Had full circulation throughout. C.I.P. 5:10 A.M. <br /> 9/20/70. Calculated top annular cement 29001 . Used B. J. Service equipment <br /> and materials. Casing equipped with Davis-Lynch guide shoe and fillup collar <br /> at top of 2nd Joint. Top fillup collar 4044' K.B. Used 3 antelope solidifiers per <br /> Joint on first 10 joints. Reciprocated casing 20' while mixing and displacing <br /> cement. <br /> 9/20/70 Landed casing, installed 8" x 6" series 900 tubing spool and tested to 3500 psi, <br /> okay. Installed second-hand christmas tree. Released rig at 9:30 A.M. 9/20/70. <br /> 10/6/70 Jack Owens Service Co. moved in and rigged up. Removed tree and installed <br /> double mechanical Shaffer gate. Picked up and measured in with used 2-3/8" tubing <br /> open-ended. Tagged top of cement at 4026' . Reverse circulated and conditioned <br /> cement-cut mud. Pressure tested pipe rams and casing to 1000 psi, okay. <br /> Pulled tubing. Rigged up Welex and ran cement-bond log. Tagged top of cement <br /> at 4025' . Logged from 4025' to 3300' . Good bond indicated throughout with top <br /> annular cement 3325' . Ran neutron correlation log from 4025' to 35001 . Jet <br /> perforated 4-1/2" casing with 4 holes at 3900' with 3-1/8" super dynajet gun. <br /> Ran 4 stands and closed well in at 3:30 A.M. <br />