Laserfiche WebLink
PA-04-276 (SU) %1W Ind <br /> Page 2 of 2 <br /> E. A public water system shall be constructed to the requirements of the Environmental Health <br /> Department and the Department of Public Works. The water system shall be shown on the <br /> Improvement Plan (San Joaquin County Development Title, Section 9-1120.2). <br /> F. Connection to an approved public water supply system is required (San Joaquin County <br /> Development Title, Section 9-1120.2) <br /> 1. Test well will be required to meet the following: <br /> a. Water quality tested to meet Title 22, CCR (Safe Drinking Water Act), requirements. <br /> b. Water quantity tested to show an adequate source. <br /> c. Results approved by the Environmental Health Department and County Public Works <br /> prior to final approval of improvement plans. <br /> 2. A letter from the water supplier will be required stating that they have the capacity to <br /> serve the development and that the system meets State standards prior to recording the <br /> final map (San Joaquin County Development Title, Section 9-1100.3). <br />