Laserfiche WebLink
Pqu I N <br /> '�Al, �° COUNTY OF SAN JOAQUIN THOMAS M.GAU <br /> �: ,yam .G <br /> DEPARTMENT OF PUBLIC WORKS DEPUTY DIRECTOR <br /> P.O.BOX 1810-1810 E.HAZELTON AVENUE <br /> STOCKTON,CALIFORNIA 95201 MANUEL SOLORIO <br /> (209) <br /> THOMAS R. FLINN FAX(209)468-2999 <br /> INTERIM pEPUTY DIRECTOR <br /> INTERIM DIRECTOR <br /> STEVEN WINKLER <br /> DEPUTY DIRECTOR <br /> November 16, 2001 RECEIVED <br /> MEMORANDUM NOV 2 9 2001 <br /> TO: Kerry Sullivan, Deputy Director Community Development Dept. <br /> Community Development Department <br /> CONTACT PERSON: Jose Rubianes <br /> FROM: Ben E. Neely Engineer II -13LN <br /> Public Services Division <br /> SUBJECT: MS-01-36 A MINOR SUBDIVISION APPLICATION TO DIVIDE A 4.52 ACRE <br /> PARCEL INTO TWO PARCELS, PARCEL ONE TO BE 2.26 ACRES, PARCEL <br /> TWO TO BE 2.26 ACRES, LOCATED ON THE NORTH SIDE OF LINNE ROAD <br /> 2500 FEET WEST OF CHRISMAN ROAD. (DISTRICT 5) <br /> APPLICANT: Triple E Engineering PROPERTY OWNER: Birla Ramesh <br /> APN. 249-080-23 <br /> INFORMATION: <br /> The site is not currently located within a Federal Flood Insurance Administration Designated Flood <br /> Hazard Area. <br /> Linne Road has an existing right-of-way width of 60 feet and a planned right-of-way width of 84 feet. <br /> The Traffic Impact Mitigation Fee will be required when parcels are developed. The fee is due and <br /> payable at the time of building permit application. <br /> RECOMMENDATIONS: <br /> 1. A Parcel Map is required. (Development Title Section 9-915.2) <br /> 2. Irrevocable Offer of Dedication to result in a 42-foot wide right-of-way from the centerline of <br /> Linne Road to the property line shall be required across the frontage of APN 248-080-23 to the <br /> property line across the parcel's frontage. (A$280.00 fee currently is required for processing <br /> per Development Title Table 9-240.2. In addition to a copy of the Grant Deed and a legal <br /> description of the parcel to be offered for dedication.) (The fee due will be based on the current <br /> fee schedule.) (Development Title Section 9-1150.5(b)) <br />