Laserfiche WebLink
b. State on revised plans the maximum number of employees and customers the sewaae disposal <br /> system is being designed for. In addition, show on revised plans that the leach field area will be <br /> barricaded so it cannot be driven over, parked on, or used as a storage area. This leach field area <br /> must be used for that specific purpose only, and it cannot contain any underground utility lines <br /> (Development Title Section 9-1110.4[c][51). In addition, the revised site plan shall incorporate the <br /> 100 percent designed sewage disposal replacement area. <br /> c. The existing well shall be tested for general minerals and nitrates prior to issuance of building <br /> permits. Samples are to be taken and analyzed for a State approved laboratory(Development Title <br /> Section 9-1115.7). <br /> NOTE: The Environmental Health Department has no permit on file for the construction of the <br /> existing well. <br /> Conditions of Approval -4 - PA-0500079 <br />