Laserfiche WebLink
necessary for the manufacturing process. <br /> (3) The building proposed for use in Phase II is a change in occupancy (Group U, utility and <br /> miscellaneous to a Group S-2, low-hazard storage) and will require a code analysis report <br /> prepared by an architect or engineer in accordance with Section 3408 of the CBC. The <br /> report shall identify existing conditions, propose alterations necessary to bring the building in <br /> compliance with the current code and include the following: <br /> (a) Description of Use <br /> (b) Occupancy Groups <br /> (c) Type of Construction <br /> (d) Sprinklers (Yes or No) <br /> (e) Stories <br /> (f) Building Height <br /> (g) Allowable Floor Area <br /> (h) Floor Area <br /> (i) CBC Occupant Load <br /> (j) Survey of necessary disability access upgrades <br /> 2. DEPARTMENT OF PUBLIC WORKS(Staff Contact: Alex Chetley, (209) 468-3023) <br /> a. The Traffic Impact Mitigation Fee shall be required for any incremental traffic resulting from this <br /> application this development. The fee is due and payable at the time of building permit application <br /> for each phase of the project. The fee will be based on the current schedule at the time of payment. <br /> The fee shall be automatically adjusted July 1 of each year by the Engineering Construction Cost <br /> Index as published by the Engineering News Record. (Resolutions R-00-433) <br /> b. The Regional Transportation Impact Fee shall be required for any incremental traffic resulting from <br /> this application this development. The fee is due and payable at the time of building permit <br /> application for each phase of the project. The fee will be based on the current schedule at the time <br /> of payment. (Resolution R-06-38) <br /> c. A copy of the Final Site Plan shall be submitted prior to release of building permit for each phase of <br /> the project. <br /> d. Verification shall be obtained from the Solid Waste Division (468-3066) for each phase of the project <br /> that this development has met the requirements of the Waste Plan Format for Development Projects. <br /> Final Site Plan is required upon submittal of verification for each phase. <br /> e. The applicant shall comply with the State Water Resources Control Board General Order No. 97-03- <br /> DWQ, "General Permit for Discharges of Storm Water Associated with Industrial Activities Excluding <br /> Construction Activities" (permit). The WDID for the Industrial General Permit issued by SWRCB shall <br /> be submitted to Public Works. Industrial dischargers already covered under the permit are required <br /> to update the Notice of Intent and submit the WDID number to Public Works. <br /> Conditions of Approval - 3 - PA-1300084 <br />