My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0005355 SSNL
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
L
>
LONE TREE
>
26510
>
2600 - Land Use Program
>
SU-98-02
>
SU0005355 SSNL
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/7/2020 11:31:38 AM
Creation date
9/6/2019 11:02:22 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
FileName_PostFix
SSNL
RECORD_ID
SU0005355
PE
2611
FACILITY_NAME
SU-98-02
STREET_NUMBER
26510
Direction
E
STREET_NAME
LONE TREE
STREET_TYPE
RD
City
ESCALON
APN
22908007,09
ENTERED_DATE
8/30/2005 12:00:00 AM
SITE_LOCATION
26510 E LONE TREE RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\L\LONE TREE\26510\SU-98-02\SU0005355\SS STDY.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
34
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
KLEIN FELDER <br /> • Continuous observation and testing during site preparation and grading <br /> and placement of Engineered Fill <br /> • Observation of foundation excavations prior to placement of <br /> reinforcing steel in the excavations <br /> • Consultation as required during construction <br /> The above listed testing and observations would be additional services provided by our firm. The <br /> costs for these services are not included in our current fee arrangements. <br /> XII. LIMITATIONS <br /> 1. , The conclusions and recommendations of this report are for design purposes for the Lone <br /> Tree Estates, Tract 2902 project as described in the text of this report. The conclusions <br /> and recommendations in this report are invalid if: <br /> • The assumed design loads change <br /> • The report is used for adjacent or other property <br /> • Changes of grades and/or groundwater occur between the issuance of <br /> this report and construction <br /> • Any other change is implemented which materially alters the project <br /> from that proposed at the time this report was prepared <br /> 20-4280-01.G01/2019R 150 Page 11 of 12 <br /> April 14, 1999 <br /> Copyright 1999 Kleinfelder,Inc. <br />
The URL can be used to link to this page
Your browser does not support the video tag.