Laserfiche WebLink
r <br /> �� \J �' ■ K L E I N F E L DER <br /> r <br /> r <br /> 8. LIMITATIONS <br /> r <br /> Phase I ESAs are non-comprehensive by nature and are unlikely to identify all environmental <br /> problems or eliminate all risk. The attached report is a qualitative assessment. Kleinfelder offers <br /> a range of investigative and engineering services to suit the needs of our clients, including more <br /> quantitative investigations. Although risk can never be eliminated, more detailed and extensive <br /> investigations yield more information, which may help you understand and better manage your <br /> risks. Since such detailed services involve greater expense, we ask our clients to participate in <br /> identifying the level of service which will provide them with an acceptable level of risk. Please <br /> contact the signatories of this report if you would like to discuss this issue of risk further. <br /> The scope of work on this project was presented in our proposal and contract number 20-YP9- <br /> ` 002, dated January 5, 1999 and subsequently approved by you as our client. Please be aware our <br /> scope of work was limited to those items specifically identified in the proposal. Environmental <br /> issues not specifically addressed in the proposal or this report were beyond the scope of our work <br /> b. and not included in our evaluation. <br /> Kleinfelder performed this environmental assessment in general accordance with the guidelines <br /> r set forth in the ASTM Standard Practice for Environmental Site Assessments: Phase I <br /> Environmental Site Assessment Process (Designation E-1527-97), and subsequently approved by <br /> you as our client. No warranty, either express or implied is made. Environmental issues not <br /> specifically addressed in the report were beyond the scope of our work and not included in our <br /> evaluation. <br /> ` Land use, site conditions (both on-site and off-site) and other factors will change over time. <br /> Since site activities and regulations beyond our control could change at any time after the <br /> ` completion of this report, our observations, findings and opinions can be considered valid only as <br /> of the date of the site visit. This report should not be relied upon after 180 days from the date of <br /> its issuance(ASTM Standard E-1527, Section 4.5). <br /> The property owner and/or client is solely responsible for notifying all governmental agencies, <br /> and the public at large, of the existence, release, treatment or disposal of any hazardous materials <br /> observed at the project site, whether before or during performance of Kleinfelder's services. <br /> Kleinfelder assumes no responsibility or liability whatsoever for any claim, loss of property <br /> value, damage, or injury which results from pre-existing hazardous materials being encountered <br /> or present on the project site,or from the discovery of such hazardous materials. <br /> L <br /> r 20-4280-0 I.E0 I/2019R177 Page 21 of 23 <br /> Copyright 1999,Kleinfelder,Ina March I, 1999 <br /> r <br />