(§ 6.2, 6.3 and 6.5) On December 2, 2005, 1400 hrs, one shallow perc test boring at 42 inches <br /> and one deeper test boring at 15 feet were drilled with a truck-mounted drill rig on proposed Parcel <br /> I and Parcel 2, along with the 25 feet exploratory boring. The test borings for Parcel 1 was drilled ' <br /> in an anticipated homesite location. <br /> The sidewalls of the shallow borings were scored with a pry-bar and the loose material removed. V, <br /> The deeper borings could not be scored due to their depths, nor was there a need to score the <br /> sidewalls since there is a sandy soil structure at this test depth. Two inches of fine gravel was <br /> placed at the bottom and three-inch perforated PVC pipe was inserted in each of the four test <br /> borings. All borings were pre-saturated on December 8, 2005 at 1000 hrs with 12 inches of water. <br /> (§ 6.4) On December 9, 2005, 0900 hrs,percolation testing commenced for all four borings. There <br /> was standing water after the 24-hour soak period in the two shallow perc tests borings due to the <br /> clay/hardpan type soil, as illustrated in Table 1 below. Consequently, EHD Pere Test Procedure#1 <br /> was conducted for these two borings. <br /> There was no standing water after the 24-hour soak period in the two deep test borings. Therefore, <br /> EHD Test Procedure#2 was performed for these borings. The last half hour of the tests was <br /> witnessed by Ted Tasiopoulos,R.E.H.S. of the San Joaquin County Environmental Health <br /> Department. The maximum acceptable perc rate is 60 min/in for shallow perc tests and 30 min/in for <br /> the deep tests. <br /> (§ 5.4 and 6.8)The following Table illustrates the proposed Parcel number,potential septic system <br /> structure based on depth of passing perc rates,proposed acreage, post soak period status and perc <br /> test results for the respective perc test depths: <br /> TABLE 1 <br /> PERCOLATION TEST RESULTS AND RELATED DATA <br /> PROPOSED PARCEL PROPOSED PERC TEST DEPTHS: POST SOAK FERC TEST <br /> AND POTENTIAL ACREAGE SHALLOW PERIOD RESULTS <br /> SEPTIC SYSTEM DEEP STATUS <br /> STRUCPURE <br /> Parcel 1 10.53 Acres 42 INCHES10 Inches FAILED <br /> Leachlines and Sumps, Standing Water (0 min/in) <br /> or Seepage Pits <br /> 180 INCHES(15 FEET) No Standing 15.6 nun/in <br /> Water in Hole <br /> Parcel 2 10.50 Acres 42 INCHES —10 Inches FAILED <br /> Leachlines and Sumps, Standing Water (0 nun/in) <br /> or Seepage Pits <br /> 180 INCHES(15 FEET) No Standing 8.9 min/in <br /> Water in Hole <br /> Page -3- <br /> Chesney Consulting <br />