Laserfiche WebLink
m <br /> o.P�'u 1K c <br /> u�! Wr <br /> THOMAS M.GAUh - P.O.BOX 1810-1810 E.HAZELTON AVENUE <br /> DIRECTOR ,C �� STOCKTON,CALIFORNIA 95201 <br /> K, nr (209)468-3000 FAX(209)468-2999 <br /> • �. p• w w.sjgov.org/pubworks <br /> 4 : <br /> 9<r FORS V1 <br /> FRITZ BUCHMAN Working for YOU RECEIVED <br /> DEPUTY DIRECTOR <br /> MICHAELSELLING IMV „ � 2012 <br /> DEPUTY DIRECTOR <br /> STEVEN WINKLER San Joaquin County <br /> DEPUTY DIRECTOR Community Development <br /> ROGER JANES <br /> BUSINESS ADMINISTRATOR <br /> June 7,2012 <br /> MEMORANDUM <br /> TO: John L.Funderburg, Principal Planner <br /> Community Development Department <br /> CONTACT PERSON: Corinne E. King <br /> FROM: Alex Chetley, Engineer VA(/ <br /> � , <br /> Public Services Division Al/ <br /> SUBJECT: PA-1200088;A Site Approval application to expand an existing pile driving equipment repair <br /> facility with the construction of a 4,800 square-foot metal building to be used for the repair of pile <br /> driving equipment; located on the east side of Walters Road(a private road)approximately 200 feet <br /> north of Loomis Road and 800 feet west of State Route 99 Frontage Road, south of the City of <br /> Stockton. (Supervisorial District 1) <br /> PROPERTY OWNER: American Pile Driving Equipment Inc. APPLICANT: WF Construction <br /> ADDRESS: 2985 E. Loomis Road, Stockton APN: 179-110-23 <br /> INFORMATION: <br /> The site is not currently located within a Federal Flood Insurance Administration Designated Flood Hazard Area. <br /> RECOMMENDATIONS: <br /> 1. The Traffic Impact Mitigation Fee shall be required for this development. The fee is due and payable at the <br /> time of building permit application. The fee shall be automatically adjusted July I of each year by the <br /> Engineering Construction Cost Index as published by the Engineering News Record.(Resolution R-00-433) <br /> 2. The Regional Transportation Impact Fee shall be required for this development. The fee is due and payable at <br /> the time of building permit application. The fee will be based on the current schedule at the time of payment. <br /> (Resolution R-06-38) <br />