Laserfiche WebLink
The supplier must possess adequate financial, managerial, and technical capability to ensure <br /> delivery of pure, wholesome, and potable drinking water in accordance with Development Title <br /> Sections 9-1120.2 and 9-1115.9 and CCR, Title 22, and Health and Safety Code Sections 116525 <br /> through 116570. <br /> e. Refuse, garbage, and other solid waste material must be stored, removed, and transported to an <br /> approved landfill in accordance with San Joaquin County Ordinance Code Section 5-2400. <br /> 4. STATE DEPARTMENT OFFISH AND GAME <br /> a. The project should be designed so that there is no loss of existing riparian or other wetland habitat. <br /> b. The project should be designed so that there are no impacts to the valley elderberry longhorned <br /> beetle. <br /> c. Any replacement riparian habitat or riparian habitat enhancement should incorporate native plant <br /> species that are taken from a local source. <br /> d. The project applicant is advised that notification to the DFG is required, pursuant to Fish and Game <br /> Code Section 1600, et sec,for proposed projects that may: <br /> (1) Divert, obstruct, or change the natural flow or the bed, channel, or bank of any river, stream, or <br /> lake; <br /> (2) Use material from a streambed;or <br /> (3) Result in the disposal or deposition of debris, waste, or other material where it may pass into <br /> any river, stream,or lake. <br /> The notification requirement applies to any work undertaken in or near a river, stream, or lake that <br /> flows at least intermittently through a bed or channel. This includes ephemeral streams and water <br /> courses. <br /> 5. STATE DEPARTMENT OF WATER RESOURCES <br /> a. A Reclamation Board Permit is required prior to any work in the channel. <br /> Conditions of Approval -4 - UP-93-14 <br />