Laserfiche WebLink
Mar-06-01 01 :49P _ �\ <br /> UP-93-14 ` <br /> Page 2 of 2 <br /> D. Construct a water well under permit and inspection of the Environmental IIealth Division <br /> prior to final occupancy approval. Should the number of non-resident individuals exceed 24 <br /> for at least 60 slays per year,or the number of service connections exceed four, a yearly <br /> permit to operate a public water system will be required by the Environmental Health <br /> L)ivision(San Joaquin County Development Title 22, Section 9-1120.2 and 9-1115,9.). <br /> The supplier must possess adequate financial,managerial, and technical capability to assure <br /> delivers=of pure,wholesome,and potable drinking water in accordance with San Joaquin <br /> County Development Title, Sections 9-1120.2 and—91115.9 and C.C.R.,Title 22, and Health <br /> and Safcty Code,Section 116525 through 116570- <br /> E. Refuse, garbage, and other solid waste material must be stored,removed and transported to <br /> an approved landfill in accordance with San Joaquin County Ordinance Cade,Section 5- <br /> 2400_ <br />