Laserfiche WebLink
GENERAL.CONSIDERATIONS: <br /> 1. Does it appear NW,any environmental feature of the proyWe Al• generate•significant public <br /> concern or controversy? <br /> Yes Fee'No Nature of concern(s): <br /> 2. Will the project require approval or permits by agencies other than the County? <br /> Z Yes ❑ No Agency name(s): Sv✓���n ►z:ti U `� �'`��`1'`'�` <br /> R L/ 9 Gv <br /> 3. is the project within the Sphere of Influence,or within two miles, of any city? <br /> []Yes ZNo City: <br /> ENVIRONMENTAL IMPACTS: <br /> "Yes"may only be checked in situations where there is substantial eviide,nce to indicate that there <br /> may be a significant adverse impact on the environment if there is no change in the project <br /> description. C{ EQA Guidelines, Sec. 15064) <br /> See the "Discussion"section at the end of the Initial Study for explanation of any impacts checked <br /> "Yes", or any"No" answer marked with an asterisk('). <br /> Sources: The following sources of information have been used in determining environmental <br /> impacts: <br /> Original source materials and maps on file in the Community Development Department including: <br /> all County and City general plans and community plans;assessor parcel books; various local and <br /> FEMA flood zone maps; service district maps; maps'of geologic instability; maps and reports on <br /> endangered species such as the Natural Diversity Data Base; noise contour maps; specific <br /> roadway plans; maps and/or records of archeologicaUhistoric resources; soil reports and maps; <br /> etc. Many of these original source materials have been collected from other public agencies or <br /> from previously prepared EIR's and other technical studies. <br /> Additional standard sources which should be specifically cited below include on-site visits by staff <br /> (note date); staff knowledge or experience; and independent environmental studies submitted to <br /> the County as part.of the project application(note report title,date, and consultant). <br /> 1. Water• <br /> a. Is any portion of the project subject to flood hazard? <br /> Flood zone: [Yes E] No <br /> b. Will the project result in reduction of surface or ground water ❑Yes ® No <br /> quality or quantity? <br /> c. Will the project result in increases to surface,channel or <br /> stream volumes,or alterations to drainage patterns and streams? (—]Yes ® No <br /> Initial Study <br /> -2- Revised 5-00 <br />