Laserfiche WebLink
d. Will the project result in erosion of or sedimentation to a channel, ❑Yes ® No <br /> river, or body of ? •.I <br /> Other sources used: <br /> 2. Earth: <br /> a. Will the project result in or be subject to potentially hazardous geologic <br /> or soils conditions on or immediately adjoining the site (slides,springs, <br /> erosion,liquefaction,earthquake faults;steep slopes, septic tank OYes 0 Nod <br /> limitations)? <br /> b_ Will the project involve substantial grading which could result in <br /> secondary impacts(consider amount,steepness, and visibility of <br /> proposed slopes;consider effect of grading on trees and creek ❑YeS ® No 4� <br /> channels)? <br /> c. Will there be conversion of prime farmland(over 40 acres and Yes Q No <br /> not shown for development in the General Plan)? <br /> Other sources used: <br /> 3. PlantfAnimal Life: i <br /> a. Will there be a reduction or disturbance to any habitat for plants and <br /> animals(including removal or disturbance of trees, riparian areas, or ❑Yes [P No <br /> migration routes)? <br /> b. Will the project impact any rare,endangered,threatened,or recreational <br /> species located on or near the site? (Check the Natural Diversity []Yes No 1V <br /> Data Base) <br /> Other sources used: <br /> 4. Alr/Climate: <br /> a. Will the project make a significant contribution to the deterioration of <br /> existing air quality,including creation of objectionable odors;will future <br /> project residents be subjected to significant pollution levels? es E No f <br /> b. Will the project result in any impact to current climatic conditions? <br /> (Consider the introduction of water features,loss of wetland,etc.) ❑Yes 21 No-eOther sources used: <br /> 5. Noise: <br /> a. Will the project expose people to high noise or vibration levels(over <br /> 65db/Ldn for residential uses or 75db/Ldn for industrial uses at the ❑YeS ® No <br /> property line)?(Check 2010 projected noise contours.) <br /> Initial Study _ -3 - Rev 5-00 <br />