Laserfiche WebLink
b. Will the project result in increased noise or vibration levels? LJxes U '"u <br /> Other sources used: <br /> 6. Ener /Natural Resources: <br /> a. Will the project use substantial amounts of fuel or energy,require a <br /> substantial increase in demand upon existing sources,or require the ❑Yes ® No <br /> development of new sources of energy? <br /> b. Will the project affect the potential use, extraction,conservation, <br /> or depletion of a natural resource(other than agricultural land)? []Yes ' ® No <br /> Other sources used: <br /> 7. Hazards: <br /> a. Will the project create a risk of explosion; release,generate or store <br /> Any hazardous substances;or cause other dangers to public health and ❑Yes gf No <br /> safety? <br /> b. Are there any known hazardous substances located within 500 feet of <br /> the boundaries of this project,if in an existing or proposed residential <br /> area (this could include possible groundwater contamination)? []Yes ® No F <br /> c. Will the project result in interference with, or need for,emergency plans? []Yes ® No <br /> Other sources used: <br /> S. Utilities and Public Service: <br /> a. "*Will the project require alteration of, addition to, or the need for new <br /> utility systems(water, sewer, drainage,solid waste),including a <br /> Sphere of Influence or district boundary change? [:]Yes No <br /> b. **Will the project result in the need for or the expansion of the following <br /> services: fire and police protection,schools,parks and recreation, <br /> libraries,roads,flood control,solid waste or other public works <br /> facilities,public transit,or governmental services? [-]Yes No <br /> c. Will the project adversely impact existing recreational/park No <br /> opportunities or require new park/recreationopportunities? []Yes ® <br /> Note: ** "Yes"answers to these two questions and 9 (b) below will require <br /> additional discussion,but do not necessarily indicate a potentially significant impact. <br /> Other sources used: <br /> 9. Transportation/Circulation: <br /> a. Will the project generate significant traffic volumes and/or make a <br /> Initial Study -4- Rev 5-00 <br />