Laserfiche WebLink
t <br /> r <br /> (6) Provide Engineered plans required for new structure, occupancy change, accessible restrooms, <br /> and parking. <br /> (7) A soils report is required. <br /> 2. DEPARTMENT OF PUBLIC WORKS (Staff Contact: Alex Chetley, 468-3000) <br /> a. An encroachment permit shall be required for all work within the road right-of-way. Driveway <br /> encroachme_rjt permits are for flatwork only. All vertical features, including but not limited to <br /> fences, walls private light standards, rocks, landscaping, and cobbles are not allowed in the right- <br /> of-way. (Development Title Sections 9-1145.4 and 9-1145.5) <br /> b. The driveway approach at Louise Avenue shall be improved in accordance with the requirements <br /> of San Joaquin County Standards R-17 prior to issuance of the occupancy permit . (Development <br /> Title Section: -1145.5) <br /> c. The site shall;be designed to contain the storm water runoff on the site and to prevent off-site <br /> sediment transport. Provide drainage facilities to meet the requirements of San Joaquin County <br /> Development Standards to prevent the increased runoff rate of storm water from discharging onto <br /> other properties. Retention basins shall be fenced with a six-foot-high chain-link.fence or equal <br /> when the maximum design depth is 18 inches or more. The required retention basin capacity <br /> shall be calculated by a registered civil engineer, licensed contractor, or licensed architect prior to <br /> the release of building permits. As an alternative option, storm drainage water will be allowed to <br /> go into a ditch provided that a will serve fetter from the irrigation district is provided. <br /> (Development Title Section 9-1135) <br /> d. The Traffic Impact Mitigation Fee shall be required for this development. The fee is due and <br /> payable at tl E time of Phase 1 building permit application. The fee will be based on the current <br /> schedule at the time of payment. The fee shall be automatically adjusted July 1 'of each year by <br /> the Engineering Construction Cost Index as published by the Engineering News Record. <br /> (Resolution F -00-433) <br /> e. The Regionq),Transportation Impact Fee shall be required for this development..The fee is due <br /> and payable,�t the time of Phase 1 building permit application. The fee will be based on the <br /> current schedule at the time of payment. (Resolution R-06-38) <br /> f. The Traffic IiP.pact Mitigation Fee shall be required for this development. The fee is due and <br /> payable at the time of Phase 2 building permit application. The fee will be based on the current <br /> schedule at the time of payment. The fee shall be automatically adjusted July 1'of each year by <br /> the Enginee.(ing Construction Cost Index as published by the Engineering News,Record. <br /> (Resolution ,-00-433) <br /> g. The Regionai Transportation Impact Fee shall be required for this development..-The fee is due <br /> and payable,;at the time of Phase 2 building permit application. The fee will be based on the <br /> current schedule at the time of payment: (Resolution R-06-38) . . <br /> 1 <br /> h. A copy of the.Final Site Plan shall be submitted prior to the release of building permits. <br /> i. Verification shall be obtained from the Solid Waste Division (468-3066)that this development has <br /> met the requirements of the Waste Plan Format for Development Projects. The Final Site Plan is <br /> of verification. <br /> required upon submittal - .. <br /> s <br /> Conditions of ApproN(al - 3- PA71000031 <br /> Si <br />