Laserfiche WebLink
Tom Walker -2- <br /> (UP-89-22 ) HARLAN ROAD <br /> AND LOUISE AVENUE <br /> 4. An encroachment permit is required for work at Harlan Road. <br /> Plans of the construction shall be approved by the Public <br /> Works Department (Permits Section ) , and an encroachment <br /> permit is required for work in other road rights-of-way. <br /> This encroachment permit for the processed water supply <br /> system will be issued after the Franchise Agreement has been <br /> approved by the Board of Supervisors. <br /> 5 . The Lathrop Traffic Impact Mitigation Fee will be required <br /> for this development. (The fee shall be $0. 38/sq.ft. of <br /> building or $3, 300/acre, whichever yields the larger fee. <br /> The fee shall be automatically adjusted annually by the <br /> Engineering Construction Cost Index as published by the <br /> Engineering News Record. ) <br /> Recommended Conditions : <br /> 1. The access road and circulation shall coordinate with the <br /> Lathrop Industrial Park development (SU-87-25/Kearney- <br /> Ventures ) . The access road shall be a minimum of 20-feet <br /> wide with the structural section and grade adequate to provide <br /> ultimate design gravel equivalent of our standard for an <br /> 84-foot industrial street after widening and adding a 2-inch <br /> overlay. <br /> TMG:RH:ml <br /> H 9D194PSM1 (2 ) <br /> c: Manuel Lopez, Deputy Director/Development <br />