My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0004714
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
L
>
LOUISE
>
500
>
2600 - Land Use Program
>
UP-98-22
>
SU0004714
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/7/2020 1:05:24 PM
Creation date
9/6/2019 11:06:15 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0004714
PE
2627
FACILITY_NAME
UP-98-22
STREET_NUMBER
500
Direction
E
STREET_NAME
LOUISE
STREET_TYPE
AVE
City
LATHROP
APN
19119006
ENTERED_DATE
11/18/2004 12:00:00 AM
SITE_LOCATION
500 E LOUISE AVE
RECEIVED_DATE
1/3/1989 12:00:00 AM
P_LOCATION
99
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\L\LOUISE\500\UP-98-22\SU0004714\APPL.PDF \MIGRATIONS\L\LOUISE\500\UP-98-22\SU0004714\CDD OK.PDF \MIGRATIONS\L\LOUISE\500\UP-98-22\SU0004714\EH COND.PDF \MIGRATIONS\L\LOUISE\500\UP-98-22\SU0004714\EH PERM.PDF
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
695
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
14.40 <br /> FINAL REVIEW <br /> Upon completion of any improvements which are constructed <br /> under and in conformance with these Standards and Specifica- <br /> tions , and prior to requesting final inspection, the area <br /> shall be thoroughly cleaned of all rubbish, excess material <br /> and equipment; and all portions of the work shall be left in a <br /> neat and orderly condition, satisfactory to the Director or <br /> Public Works and the Owner. <br /> Within 10 days after receiving the request for final <br /> inspection, the Director of Public Works shall inspect the <br /> work. The Contractor, Consulting Engineer, and Developer will <br /> be notified in writing as to any particular defects or <br /> deficiencies to be remedied. The Contractor shall proceed to <br /> correct any such defects or deficiencies at the earliest <br /> possible date. At such times, as the work has been completed, <br /> a second inspection shall be made by the Director of Public <br /> Works to determine if the previously mentioned defects have <br /> been repaired, altered and completed in accordance with these <br /> Standards and Specifications. <br /> When the work has been completed in accordance with the <br /> approved plans and specifications, the Director will recommend <br /> acceptance of the work to the Board of Supervisors. The <br /> Director will notify, in writing, the Contractor, Consulting <br /> Engineer and the Owner as to the date of approval and final <br /> acceptance. <br /> M - 7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.