My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0002287
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
L
>
LOWER SACRAMENTO
>
11171
>
2600 - Land Use Program
>
UP-95-09
>
SU0002287
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/7/2020 11:29:09 AM
Creation date
9/6/2019 11:07:40 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0002287
PE
2655
FACILITY_NAME
UP-95-09
STREET_NUMBER
11171
Direction
N
STREET_NAME
LOWER SACRAMENTO
STREET_TYPE
RD
City
LODI
Zip
95240
APN
05903023
ENTERED_DATE
10/26/2001 12:00:00 AM
SITE_LOCATION
11171 N LOWER SACRAMENTO RD
RECEIVED_DATE
2/22/2005 12:00:00 AM
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\L\LOWER SACRAMENTO\11171\UP-95-09\SU0002287\APPL.PDF \MIGRATIONS\L\LOWER SACRAMENTO\11171\UP-95-09\SU0002287\CDD OK.PDF \MIGRATIONS\L\LOWER SACRAMENTO\11171\UP-95-09\SU0002287\EH COND.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
119
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
.. .WO <br /> To Development Committee <br /> From: Richard Larrouy <br /> Sub : UP-95-9 (Bear Creek Church) <br /> Date: 8-16-95 <br /> Page: - 3 - <br /> PHASE 4 : construction of a 27, 000-square-foot, two- <br /> story, 1, 000-seat worship facility; and <br /> PHASE 5: construction of a 10, 000-square-foot, two- <br /> story, 200-seat community services building to <br /> accommodate Sunday classrooms, administrative offices, a <br /> library, a media and music production room, a group <br /> meeting room, a counseling facility, and a video <br /> production room. <br /> b. BUILDING PERMIT. Submit "Commercial Building Permit <br /> Applications" for the approved structures. The Site Plan <br /> required as a part of the building permit may be phased <br /> and must be prepared by a registered civil engineer or <br /> licensed architect. This Plan must show drainage, <br /> driveway access details (including gates) , on-site <br /> parking, landscaping, signs, existing and proposed <br /> utility services, and grading (refer to the "SITE PLAN <br /> CHECK LIST" for details) . A fee is required for the Site <br /> Plan review (Development Title Section 9-884) . The <br /> building permit for either of the structures approved as <br /> part of Phase 1 shall be submitted to the Building <br /> Inspection Division within 18 months of the project's <br /> effective date. <br /> C. STORM DRAINAGE. Stormwater drainage shall be retained on <br /> the site. The drainage pattern and corresponding storm <br /> drain improvements shall be shown on the Site Plan. <br /> Drainage calculations prepared by a registered civil <br /> engineer or architect shall be included. <br /> d. PARKING and SURFACING. Off-street parking shall be <br /> provided and comply with the following: <br /> (1) All parking spaces, driveways, and maneuvering <br /> areas shall be surfaced and permanently maintained <br /> with base material of appropriate depth and asphalt <br /> concrete or Portland cement concrete to provide a <br /> durable, dust-free surface. (Development Title <br /> Section 9-1015 . 5) <br /> (2) Bumper guards shall be provided where necessary to <br /> protect adjacent structures or properties. <br /> (Development Title Section 9-1015. 5) <br />
The URL can be used to link to this page
Your browser does not support the video tag.