v <br /> Revised Conditions <br /> Use Permit Application No. UP-95-9(revised)was approved by the Planning Commission on July 19, <br /> 2001. The effective date of approval is July 29, 2001. This approval will expire on March 11, 2005, <br /> unless (1) all Conditions of Approval have been complied with, (2) all necessary building permits <br /> have been issued and remain in force, and (3) all necessary permits from other agencies have been <br /> issued and remain in force. <br /> Unless otherwise specified, all Conditions of Approval and ordinance requirements shall be <br /> fulfilled prior to the establishment of the use and the issuance of any building permits. Those <br /> Conditions followed by a Section Number have been identified as ordinance requirements <br /> pertinent to this application. Ordinance requirements cannot be modified, and other ordinance <br /> requirements may apply <br /> 1. COMMUNITY DEVELOPMENT DEPARTMENT(Staff Contact:Leanne Mueller,468-3228) <br /> a. APPROVED USE: This approval shall be to establish a church facility with a Sunday school in five <br /> phases over five eight years. For the purpose of this application the eight-year phasing shall have <br /> begun when the 18 months allowed by the original application expired The applicantshall have until <br /> March 11 2005 to obtain all necessary permits to complete the proposed prosect as shown on the <br /> revised Site Plan dated May 18 2001 and as described below: <br /> (1) PHASE 1: Construction of a 5,600-square-foot membrane structure for a 299-seat worship <br /> center and a 3,600-square-foot multi-purpose building to house Sunday school classrooms, <br /> offices,and restrooms; <br /> (2) PHASE 2: Construction of a 14,500-square-foot multi-purpose building to house a 500-seat <br /> worship center, offices, and Sunday school classrooms and the removal of the membrane <br /> structure; <br /> (3) PHASE 3: Construction of 10,000-square-foot,two-story, 300-seat classroom building and the <br /> conversion of the 3,600-square-foot multi-purpose building to a vehicle and equipment garage, <br /> storage area,and concession space; <br /> (4) PHASE4: Construction of a 27,000-square-foottwo-story, 1,000-seat worship facility;and <br /> (5) PHASE 5: Construction of a 10,000-square-foot, two-story, 300-seat community services <br /> building to accommodate Sunday classrooms, administrative offices, a library, a media and <br /> music production room, a group meeting room, a counseling facility, a video production room, <br /> and the conversion of the 500-seat worship center(Phase 2) into a gymnasium and a meeting <br /> room. <br /> b. BUILDING PERMIT: Submit an "APPLICATION-COMMERCIAL BUILDING PERMIT' for the <br /> approved structures. The Site Plan required as a part of the building permit may be phased and <br /> must be prepared by a registered civil engineeror licensed architect. This Plan must show drainage, <br /> driveway access details(including gates),on-site parking, landscaping,signs, existing and proposed <br /> utility services,and grading(refer to the"SITE PLAN CHECK LIST'for details). A fee is required for <br /> the Site Plan review (Development Title Section 9-884). The building permit for either of the <br /> structures approved as part of Phase 1 shall be submitted to the Building Inspection Division within <br /> 18 months of the project's effective date of approval. No building permit application for the approved <br /> project will be accepted after five eight years from the project's effective date of approval. <br /> Revised Conditions 1 - UP-95-9 <br />