Laserfiche WebLink
for each phase of the project. These parking space(s)shall be located as close as possible to <br /> the primary entrance to the building. <br /> 11) Adequate sanitary facilities shall be provided for the facility, per the requirements of Chapter 4 <br /> of the California Plumbing Code. <br /> 12) Pursuant to Section 422.4 of the California Plumbing Code, toilet facilities shall be accessible <br /> to employees at all times, should not be more that 500 feet from where employees are regularly <br /> employed and accessible by not more than one flight of stairs. The plans shall indicate the <br /> location of the toilet facilities and the travel distance from work areas. <br /> 13) This project will be required to comply with the Model Water Efficient Landscape Ordinance <br /> requirements of the California Code of Regulations, Title 22, Division 2, Chapter 2.7 <br /> I. FIRE CODE REQUIREMENTS: The following California Fire Code (CFC) requirements will be <br /> applicable to the proposed project. The following conditions shall be addressed prior to submittal <br /> of a building permit application to the Building Inspection Division. <br /> 1) CFC 507 Fire Protection Water Supply- Fire flow and hydrants shall be provided for the <br /> proposed project by the use of. CFC Appendix B. <br /> 2) If Fire protection Systems are required they shall be installed according to the CFC, Chapter 9 <br /> and the appropriate standards and guides adopted in Chapter 35 of the California Building <br /> Code and the California Electrical Code. <br /> 3) CFC, Section 503 Fire Apparatus Access Roads-Shall be provided as required by this section. <br /> 503.1.2-A secondary access may be required. <br /> 4) CFC, Section 906 Portable Fire Extinguishers—Provide portable fire extinguishers as required <br /> by this section. <br /> 5) CFC, Section 5001.3.3.1 Properties of Hazardous Materials- A complete list of hazardous <br /> materials used and or stored at this site shall be provided. <br /> 6) A complete review, at building permit submittal, will require compliance with applicable codes <br /> and ordinances. <br /> 7) CFC, Section 105 Permits: Operational Permit(s) may be required prior to occupancy. <br /> 2. DEPARTMENT OF PUBLIC WORKS: (Staff Contact: Awni Taha, [209]468-3000). <br /> a. The developer shall provide drainage facilities in accordance with the San Joaquin County <br /> Development Standards. Retention basins shall be fenced with six(6)foot high chain link fence or <br /> equal when the maximum design depth is 18 inches or more. Required retention basin capacity <br /> shall be calculated and submitted along with a drainage plan for review and approval, prior to <br /> release of building permit. (Development Title Section 9-1135) <br /> b. A copy of the Final Site Plan shall be submitted prior to release of building permit. <br /> c. The proposed project disturbs less than one (1) acre of ground and is not part of a larger plan of <br /> common development. The construction phase of the proposed project shall follow best <br /> management practices of the County"Small Site Storm Water Management Plan". <br /> Informational Notes: <br /> (i) A Solid Waste Diversion Plan for all applicable projects must be submitted to the Building <br /> PA-1900042 (UP) Conditions of Approval 4 <br />