Laserfiche WebLink
gRA4!.ry. 9 � <br /> +' 1 <br /> THOMAS R. FLINN rAIN ����g� P.O.BOX 1810-1810 E.HAZELTON AVENUE DIRECTOR Or^'"1 h STOCKTON,CALIFORNIA 95201 <br /> (209)468-3000 FAX(209)468-2999 <br /> www.sjgovorg/pubworks <br /> THOMAS M.GAU <br /> CHIEF DEPUTY DIRECTOR <br /> MANUEL SOLORIO Working for YOU <br /> DEPUTY DIRECTOR <br /> STEVEN WINKLER <br /> DEPUTY DIRECTOR <br /> ROGER JANES <br /> BUSINESS ADMINISTRATOR /''� <br /> Rr.CEI V ED <br /> May 6,2009 MAY 8 2005 <br /> M E M-O R A N D U M GommunitY DVOIOMant Dept <br /> s' <br /> TO: Rick Griffin, Senior Planner <br /> Community Development Department <br /> CONTACT PERSON: Rick Griffin <br /> FROM: Bill DuBois,Engineer III <br /> Public Services Division <br /> SUBJECT: PA-0900007; A Site Approval application to construct a 3,550 square foot auto sales building for <br /> collectible cars only; located on the east side of North Lower Sacramento Road, 1,000 feet north <br /> of Augusta Street, Woodbridge. (Supervisorial District 4) <br /> PROPERTY OWNER: Joseph K.Newfield III APPLICANT: Gerardo Espinosa <br /> ADDRESS: 19000 North Lower Sacramento Road APN: 015-240-03 <br /> INFORMATION: <br /> The site is not currently located within a Federal Flood Insurance Administration Designated Flood Hazard Area. <br /> North Lower Sacramento Road has a variable existing right-of-way'width and a planned right-of-way width of 80 <br /> feet. <br /> RECOMMENDATIONS: <br /> 1. An encroachment permit shall be required for all work within road right-of-way. (Note: Driveway <br /> encroachment permits are for flatwork only—all vertical features,including but not limited to fences, <br /> walls,private light standards,rocks, landscaping and cobbles are not allowed in the right-of-way.) <br /> (Development Title Sections 9-1145.4 and 9-1145.5) <br /> 2. The Traffic Impact Mitigation Fee shall be required for this development. The fee is due and payable at the <br /> time of building permit application. The fee shall be automatically adjusted July 1 of each year by the <br /> Engineering Construction Cost Index as published by the Engineering News Record.) (Resolution R-00-433) <br /> 3. The Regional Transportation Impact Fee shall be required for this development. The fee is due and payable at <br /> the time of building permit application. The fee is based on the current schedule. (Resolution R-06-38) <br />