Laserfiche WebLink
County standards for an 84-foot-wide right-of-way arterial road. (Development.Title.Section 9- <br /> 1150.5[b]) <br /> f. All the roads within the subdivision shall be designed, named, and improved to County standards for <br /> a 50-foot-wide rural residential road. (Development Title Section 9-1150.5[c]) <br /> g. -Residential Lots 19 through 35 shall have restricted access to Lower Sacramento Road and Liberty <br /> Road` fdess'fihts shall be relinquished on the Final Map.`(I`le3elopment Title Section 91$05[f]) <br /> h. A secondary access connection to the south shall-be provided for this subdivision. (Development <br /> Title Section 9=1150.13) <br /> i. This subdivision is approved for recording as a single unit; phasing is not approved. (Development <br /> Title Section 9-1100.3) <br /> j. A community detention pond/terminal drainage system shall be provided to meet the requirements of <br /> the County and to provide adequate drainage for the subdivision. Hydrologic and hydraulic analyses <br /> shall be provided and shall demonstrate that all property, both downstream and upstream of the <br /> discharge,will not be subject to a higher flood level as a result of the proposed drainage. The San <br /> Joaquin County Interim Flood Hazard Reduction Policy shall apply to this Major Subdivision. <br /> (Development Title Section 9-1135.2) <br /> k. The project shall be served by a public water system conforming to the requirements of the <br /> Environmental Health Department and Department of Public Works(two wells are required). The <br /> system shall provide adequate domestic and fire water supply in conformance to the requirements of <br /> the county Fire Warden and the local fire district. A test well showing that the production well will <br /> meet all applicable standards is required prior to the approval of the improvement plans of any work <br /> within the site. (Development title Section 9-1120.2) <br /> I. Street lighting shall be provided for the subdivision and the frontages of Lower Sacramento Road <br /> and Liberty Road. (Development Title Section 9-1150.11) <br /> m. Annexation of the development into CSA 29 for water, storm drainage, and street lighting shall be <br /> required prior to approval of the Final Map. <br /> n. The property shall transfer to a zone within CSA 29 prior to approval of the Final Map to provide for <br /> the operation, maintenance, and improvement of water services, storm drainage, and street lighting <br /> facilities. The applicant shall complete the Proposition 218 process for services and pay the fair <br /> share to the County. The development will receive serves conditional upon completion of all <br /> necessary facilities and passage of the Proposition 218 vote. A new assessment for the zone shall <br /> be approved by the property owners prior to recording the Final Map. The assessment for the new <br /> zone shall be based on the cost for maintenance, operation, system improvements, and any <br /> replacement program of facilities within CSA 29. The applicant shall pay for the cost to process the <br /> transfer and assessment for the new zone. In addition, the applicant shall pay for the maintenance <br /> and operation of the system from the time the facilities are accepted by the District until the <br /> transferred area is placed on the assessment role of the District. (Development Title Section 9- <br /> 1100.5) <br /> o. Water meters shall be installed on all water services. (Board Order B-91-650) <br /> p. An Offer of Dedication of ground water rights is required on the Final Map. <br /> q. All utilities shall be underground except power transmission facilities of 35 KV or greater. Public <br /> utility easements shall be provided along the road frontage of the subdivision and as required by the <br /> public utility companies. (Development Title Section 9-1155.2) <br /> PA-0400074 (SU, TE) Conditions of Approval 4 <br />