Laserfiche WebLink
41 <br /> conditions of Approval <br /> SA-92-52 <br /> Page 2 <br /> -t <br /> All parking spaces, driveways, and maneuvering areas <br /> shall be surfaced and permanently maintained with base <br />'f material and asphalt concrete, or Portland cement <br /> concrete. Bumper guards shall be provided when necessary <br /> to protect adjacent structures or properties. Storage <br /> parking areas shall be improved with four (4) inches of <br /> aggregate base material and a chip seal. (Development <br /> Title Section 9-1015. 5{e}) <br /> Submit an Improvement Plan prepared by a registered Civil <br /> Engineer, showing drainage, driveway access details, on- <br /> site parking, existing and proposed utility services, and <br /> grading. Storm drainage run-off shall be terminal <br /> (submit written approval, from Regional Water Quality <br /> Control Board for discharge into Duck Creek) . The . <br /> drainage pattern and corresponding storm drain <br /> improvements shall be shown on the Improvement Plan. <br /> Outlet calculations and details shall be submitted for <br /> approval. A plan check fee will be required. <br /> (Development Title Section 9-884 . 2) <br /> 2 . DEPARTMENT OF PUBLIC WORKS: `z {i ` <br /> a. Dedication to result in a 30 foot wide right-of-way from <br /> the centerline of Munford Avenue to the property line <br /> shall be required across the frontage of APN 179-100-14 . <br /> (Development Title Section 9-1145.5) <br /> b. Driveway approach on Munford Avenue shall be improved in <br /> accordance with the requirements of the San Joaquin <br /> County Standard R-17 prior to issuance of the building <br /> permit. (Development Title Section 9-1145. 5) <br /> C. Encroachment permit shall be required for work within <br /> road right-of--way. (Development Title Section 9-1145.2) <br /> d. Maneuvering area shall be provided. No vehicle backing <br /> onto Munford Avenue is allowed. (Development Title <br /> Section 9-101.5 . 5) <br /> e. The Traffic Impact Mitigation Fee will be required for <br /> this development. The fee is due and payable at the time <br /> _ of� .building. permit application. (The fee currently is.,, r.. <br /> 1 R_� _$1;3.99. 00 per--.1,000 gross ' square, foot. . of---building.., <br /> "Warehouse" or $286.45 per daily trip-end generated in _ <br />