Before You Begin 4. Rake the bottom and sides if smearing has occurred while <br /> excavating. Remove any large stones and other debris. Do not <br /> Quick4 Standard Chambers may only be installed accord- use the bucket teeth to rake the trench bottom. <br /> ing to State and/or local regulations. If unsure of the Note:Raking to eliminate smearing is not necessary in <br /> installation requirements for a particular site, contact the sandy soils. In fine textured soils(silts and clays), avoid <br /> local health department. walking in the trench to prevent compaction and loss of <br /> Like conventional systems,the soil and site conditions must be soil structure. <br /> approved prior to installation. Conduct a thorough site evalu- 5.Verify that each trench is level using a level, transit, or laser. <br /> ation to determine the proper sizing and siting of the system <br /> before installation. <br /> Preparing the End Cap <br /> 1.With a screwdriver or utility <br /> Materials and Equipment Needed knife start the tear-out seal at <br /> ❑Quick4 Standard ❑ Hole Saw the appropriate diameter for <br /> Chambers ❑2-inch Drywall Screws* the inlet pipe. The seal allows <br /> ❑MultiPort End Caps ❑Screw Gun' SDRfor a tight fit for 3 inch, 4-inch <br /> ❑PVC Pipe and Couplings ❑Small Valve-Cover Box* pipe. <br /> and 4-inch SCH40 <br /> p <br /> ❑Backhoe ❑4-inch Cap for pipe. <br /> ❑Laser,Transit, or Level Inspection Port* <br /> ❑Shovel and Rake <br /> ❑Tape Measure * Optional ' <br /> ❑Screwdriver or Knife Start tear-out seal. <br /> These guidelines for construction machinery must be 2. Pull the tab on the tear-out <br /> followed during installation: <br /> seal to create an opening on <br /> ❑Avoid direct contact with chambers when using the end cap. <br /> construction equipment. Chambers require a 12-inch <br /> minimum of compacted cover to support a wheel load <br /> rating of 16,000 lbs/axle or equivalent to an H-10 <br /> AASHTO load rating. <br /> ❑Only drive across the trenches when necessary. Never <br /> drive down the length of the trenches. <br /> ❑To avoid additional soil compaction, never drive heavy 2 <br /> vehicles over the completed system. Pull tab on tear-out seal. <br /> 3.Snap off the molded splash <br /> plate located on the bottom <br /> Excavating and Preparing the Site front of the end cap. <br /> Note:As is the case with conventional systems, do not 4. Install splash plate into the <br /> install the systems in wet conditions or in overly moist soils, appropriate slots below the <br /> as this causes machinery to smear the soil. inlet to prevent trench bottom <br /> 1. Stake out the location of all trenches and lines. Set the erosion. <br /> elevations of the tank, pipe, and trench bottom. <br /> 2. Install sedimentation and erosion control measures. 4 <br /> Temporary drainage swales/berms may be installed to protect Install splash plate. <br /> the site during rainfall events. <br /> 3.Excavate and level 3-foot wide trenches with proper center- 5.Insert the inlet pipe into the <br /> to-center separation. Verify that the trenches are level or have end cap at the beginning of <br /> the prescribed slope. the trench.The pipe will go in <br /> Note:Over excavate the trench width in areas where you one inch before reaching a <br /> are planning to contour. stop. (Screws optional.) <br /> s <br /> Insert inlet pipe. <br /> Page 2 <br />