My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0006056_SSNL
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
O
>
120 (STATE ROUTE 120)
>
10800
>
2600 - Land Use Program
>
PA-0600190
>
SU0006056_SSNL
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2024 3:59:59 PM
Creation date
9/8/2019 12:31:57 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
FileName_PostFix
SSNL
RECORD_ID
SU0006056
PE
2632
FACILITY_NAME
PA-0600190
STREET_NUMBER
10800
Direction
E
STREET_NAME
STATE ROUTE 120
City
MANTECA
Zip
95336
APN
22803024
ENTERED_DATE
5/23/2006 12:00:00 AM
SITE_LOCATION
10800 E HWY 120
RECEIVED_DATE
5/23/2006 12:00:00 AM
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\O\HWY 120\10800\PA-0600190\SU0006056\NL_SS STDY.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
76
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
11*W <br /> Installing the System 8.To ensure structural stability, fill the sidewall area by pulling <br /> soil from the sides of the trench with a shovel. Start at the joints <br /> 1. Check the header pipe to be sure it is level or has the where the chambers connect. Continue backfilling the entire <br /> prescribed slope. sidewall area, making sure the fill covers the louvers. <br /> 2. Set the invert height at 8 inches from the bottom of the inlet. g. Pack down the fill by walking along the edges of the trench <br /> 3. Place the inlet end of the 4,. and chambers. This is an important step in assuring structural <br /> ,,¢ <br /> first chamber over the back li i support. <br /> edge of the end cap. Note:In wet or clay soils, do not walk in the sidewalls. <br /> 4. Lift and place the end of 10. Proceed to the next trench and begin with Step 1. <br /> the next chamber onto the <br /> the previous chamber by <br /> holding it at a 45-degree Installing Optional Inspection Ports <br /> angle. Line up the chamber 1. With a hole saw drill the pre-marked area in the top of the <br /> end between the connector chamber to create a 4-inch opening. <br /> hook and locking pin at the 3 <br /> top of the first chamber. 2. Set a cut piece of pipe of the appropriate length into the <br /> Lower it to the ground to con. Place first chamber onto end cap. corresponding chamber's inspection port sleeve. <br /> nect the chambers. Note:The sleeve will accommodate a 4-inch SCH40 pipe. <br /> Note: When the chamber 3. Use two screws to fasten <br /> end is placed between the the pipe to the sleeve around <br /> connector hook and locking the inspection port. <br /> pin at a 45-degree angle, 4. Attach a threaded cap or <br /> the pin will be visible from cleanout assembly onto the <br /> the back side of the chamber. protruding pipe at the appro- <br /> Note: The connector hook priate height. <br /> serves as a guide to insure 5. A small valve cover box <br /> proper connection and does may be used if inspection <br /> not add structural integrity 4 port is below the desired 3 <br /> to the chamberjoint.Broken Connect the chambers. grade. Fasten the pipe. <br /> hooks will not affect the struc- <br /> ture nor void the warranty. <br /> 5.Swivel the chamber on the Covering the System <br /> pin to the proper direction for <br /> the trench layout. Before backfilling,the system must be inspected by a health <br /> officer or other official as required by State and local codes. <br /> Note: The Quick4 Standard Create an as-built drawing at this time for future records. <br /> Chamber allows 10 degrees <br /> of swivel in either direction 1. Backfill the trench by pushing fill material over the chambers <br /> at each joint. with a backhoe. Keep a minimum of 12 inches of compacted <br /> cover over the chambers before driving over the system. <br /> 6. Continue connecting the <br /> 5 Note:Do not drive over system while backfilling in sand. <br /> chambers until the trench is <br /> completed. Swivel the chamber. Note: For shallow cover applications, you must mound 12 <br /> Note: As chambers are inches of soil over the system before driving over it, and then <br /> installed, verify they are level grade it back to 6 inches upon completion. <br /> or have the prescribed slope. 2. It is best to mound several inches of soil over the finish grade <br /> 7. The last chamber in the to allow for settling.This also ensures that runoff water is divert- <br /> trench requires an end cap. ed away from the system. <br /> Lift the end cap at a 45-degree 3. After the system is covered, the site should be seeded or <br /> angle and insert the connector sodded to prevent erosion. <br /> hook through the opening on Note:If the system is for new home construction it is important <br /> the top of the end cap. to leave marking stakes along the boundary of the system. <br /> Applying firm pressure, lower This will notify contractors of the site location so they will not <br /> the end cap to the ground to cross it with equipment or vehicles. <br /> snap it into place. Do not 7 <br /> remove the tear-out seal. Attach end cap to chamber. <br /> Page 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.