Laserfiche WebLink
COUNTY OF SAN JOAQUIN <br /> THOMAS R.FLINN <br /> DEPARTMENT OF PUBLIC WORKS DEPUTY DIRECTOR <br /> P.O.BOX 1810-1810 E.HAZELTON AVENUE <br /> • ���ic Ow`'`• STOCKTON,CALIFORNIA 95201 THOMAS M.GAU <br /> (209)468-3000 DEPUTY DIRECTOR <br /> MANUEL LOPEZ FAX(209)468-2999 <br /> DIRECTOR <br /> STEVEN WINKLER <br /> DEPUTY DIRECTOR <br /> December 19, 2000 <br /> MEMORANDUM nEC 2 02000 <br /> TO: Kerry Sullivan, Deputy CommunityDeveloN: Director'Depart meeister COIpI1lJlllty Ug y8l0;? gOtGg <br /> CONTACT <br /> FROM: G W Gabriel Karam, Senior Civil Engineer <br /> Public Services Division <br /> SUBJECT: UP-00-22 A USE PERMIT APPLICATION FOR A YOUTH SOCCER <br /> COMPLEX (PARK)WITH PRACTICE FIELD AND CHANGING FACILITY. <br /> PHASE ONE TO INCLUDE A 6,000-SQUARE-FOOT CHANGING AND <br /> MEETING FACILITY,A 600-SQUARE-FOOT MAINTENANCE BUILDING <br /> PARKING, AND A SOCCER FIELD. PHASE TWO TO INCLUDE <br /> TWO SOCCER FIELDS, LOCATED ON THE NORTH SIDE OF STATE <br /> HIGHWAY ROUTE 120,APPROXIMATELY 800 FEET WEST OF <br /> VICTORY ROAD. (DISTRICT 5). <br /> APPLICANT: California Milk Market,Inc APN: 229-190-13 <br /> INFORMATION: <br /> The site is not currently located within a Federal Flood Insurance Administration Designated <br /> Flood Hazard Area. <br /> State Highway Route 120 has an existing right-of-way width of 60 feet and a planned a <br /> right-of-way width as determined by Caltrans. <br /> RECOMMENDATIONS: <br /> I. The Traffic Impact Mitigation Fee will be required for this development. The fee is due <br /> and payable at the time of building permit application. (The fee currently is $1,097 per <br /> 1,000 gross square foot of building as Service Commercial generated in the Escalon <br /> area. The fee shall be automatically adjusted July 1 of each year by the Engineering <br /> Construction Cost Index as published by the Engineering News Record. <br /> (Resolutions R-90-304, R-91-1025, R-93-167,R-94-179, R-95-650 and R-96-592) <br /> 2. A copy of the Final Site Plan shall be submitted prior to release of building permit. <br /> 3. Verification shall be obtained from the Solid Waste Division(468-3066)that this <br /> development has addressed the items on the attached Waste Plan Format for <br /> Development Projects. Final Site Plan is required upon submittal of verification. <br /> GK:RH:gn <br /> E: Thomas M. Gau, Deputy Director/Development <br />